Latin America / facility / reviewed 2026-09-28

Itaú · Mogi Mirim campus

Bank computing campus with a 2014 construction record.

Racional describes two data centers completed in the first phase. The facility is not classified as an AI or military installation by this evidence.

Follow a relationship.

Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.

documented

Bank construction client

Itaú Unibanco → Itaú · Mogi Mirim campus

The 2014 project record identifies Itaú as client.

Date not isolated · facility client

documented

Design coordination and construction

Racional Engenharia → Itaú · Mogi Mirim campus

Racional managed design execution and construction; the recorded first phase was completed in 2014.

Date not isolated · general construction

documented

Physical project location

Itaú · Mogi Mirim campus → Brazil

Geographic relationship only; it does not establish government funding, military use or a political alliance.

Date not isolated · located in

proposal

Proposed data-center levy scope

Itaú · Mogi Mirim campus → AI companies & data-center operators

This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.

Date not isolated · proposed levy coverage

Sources in this record.

  1. Centro Tecnológico ItaúRacional Engenharia · Publication date not isolated · source access 2026-09-28

    Portuguese contractor case study: first phase and two data centers completed in 2014. This is a bank computing facility; the record does not establish an AI workload or military contract.