DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
A large Google data-center building beyond a fence, with dry hills and a clouded sky at The Dalles, Oregon.Photograph loading from this report.
The Dalles, Oregon, 2015. A physical view of cloud infrastructure—not evidence of a military workload at this particular site. Photo: Tony Webster · CC BY 2.0. Full credit and modifications: photo register.
A GLOBAL INFRASTRUCTURE REPORT

DIVESTMENT
& THE
LIVING WORLD

Military customers. Cloud infrastructure.
Capital, contractors and ecological repair.

BDS solidarity · Community power · Paid ecological care

REPORT 01
30 SEPTEMBER 2026
PUBLIC-SOURCE RESEARCH
INDEPENDENT ADVOCACY
Independent solidarity research · September 202601
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
READING GUIDE

Contents & scope

Evidence base: the project’s 28 September 2026 public-data snapshot, supplemented by selected primary-source checks on 30 September 2026. The Oakland People's Arms Embargo campaign against FedEx's reported shipments of F-35 parts is active in 2026. The uploaded Palestinian Youth Movement report, Exposing Oakland Airport’s Military Cargo Shipments to Israel, was published 28 August 2025 and is a reference, not this investigation's dataset.

Independent solidarity research · September 202602
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
01 / FINDINGS

Executive summary

The companies selling artificial intelligence and cloud services do not operate in a weightless economy. Their products depend on land, power, construction, equipment, maintenance, financing and institutional customers. Some relationships with military and defense institutions are documented directly; others remain unproven at the level of a particular facility or workload. The political task is to make those differences legible—not to erase them.

Five findings that can guide action

1. Military relationships are not merely hypothetical. Israel’s government procurement record identifies Google and Amazon Web Services as Nimbus cloud suppliers and includes the Ministry of Defense and IDF among the initiative’s collaborators. Microsoft’s September 2025 statement describes a partial withdrawal of particular services, not the termination of its entire relationship with Israel’s defense institutions. These records justify scrutiny of contracts and institutional dependence; they do not identify every data center processing a military workload.[1, 2]

2. There are named organizations beneath the platform brands. The project snapshot contains 29 facility dossiers, 91 participating entities and 129 facility-related connections. Examples include Southland’s mechanical work at Vantage AZ1, Plan Group’s continuing support at RBC Guelph, CBRE’s technical-operations contract at Hamar, and multiple Electra divisions at Bank Hapoalim’s Rotem facility. This is a selected, uneven research inventory—not a census of the world’s data centers.[3, 4, 5, 6]

3. Infrastructure finance requires separate accounting categories. Crusoe’s $600 million Series D, Brookfield’s $750 million credit facility, and the $15 billion Abilene joint venture describe different financial instruments and scopes. They cannot be added into a reliable estimate of expenditure, nor assigned in full to every named investor.[7, 8, 9]

4. The ecological stakes are material and dated. The IEA estimates that data centers used 415 TWh of electricity in 2024; its 945 TWh figure for 2030 is a projection. UNEP’s September 2025 Gaza assessment documents severe damage to agricultural and ecological systems. Neither number is a measured 2026 total, and neither makes environmental destruction interchangeable across places.[10, 11]

5. Withdrawal needs a democratic destination. This report proposes coupling focused divestment and procurement campaigns with a mandatory ecological levy on AI and data-center activity. It proposes paid land care, public research and community control—not an offset scheme that licenses further military or ecological harm. That policy proposal is distinct from official BDS demands.

Independent solidarity research · September 202603
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
02 / METHOD

How to read the evidence

The unit of analysis is a dated relationship: a procurement award, named construction scope, operations appointment, financing instrument, donor disclosure or movement campaign position. The report preserves the distinctions already built into the project’s evidence ledger. A company’s marketing page can establish what that company says it supplied; it is not independent proof of the performance or consequences of the system.

LabelWhat it establishesWhat it does not establish
Official recordA government’s stated procurement, administrative or regulatory action.All downstream uses; expenditure beyond the disclosed amount.
Corporate disclosureA company’s own stated role, investment or service action.Independent validation of all claims, impacts or current operating conditions.
Research findingA result within the study’s population, methods and period.Universal effects or an automatically transferable local outcome.
Campaign positionWhat a named movement asks its supporters or institutions to do.A court judgment or independent proof of every underlying allegation.
Interpretation / proposalThe project’s political analysis or recommended mechanism.An existing law, implemented fund or endorsed BDS policy.

Two dates, not one blanket verification claim

The underlying snapshot is dated 28 September 2026. Selected source pages were re-read for this edition on 30 September 2026. The source register marks which entries received that additional check. Other entries retain their snapshot provenance; an inaccessible page is not silently treated as newly verified. Publication dates, historic project periods, and anticipated completion dates are kept separate.

The snapshot contains 331 entities, 474 relationships, 50 financial records and 122 source records. These are inventory counts calculated from the supplied files, not a measure of complicity or research completeness. The facility subset covers 29 named sites in 16 countries. The financial ledger has no valid grand total. Countries are not included merely for alliance membership.

Independent solidarity research · September 202604
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
03 / MILITARY CUSTOMERS

Cloud companies are
institutional suppliers

The strongest starting point is a named customer relationship, rather than the appearance of a familiar corporate logo in a network diagram. Three records illustrate why the wording of an award or a service statement matters.

Project Nimbus: procurement and defense participation

Israel’s Government Procurement Administration identifies Google and Amazon Web Services as the selected cloud providers in Nimbus. Its institutional description includes the Ministry of Defense and the IDF among the project’s collaborators. This provides a primary-source basis for discussing a government cloud initiative with defense participation.[1]

The documented connection is supplier → procurement program → participating institutions. The page is not a register of individual workloads or attacks; those claims require separate records.

Microsoft: a partial restriction is not a complete exit

On 25 September 2025, Microsoft said it had disabled specified cloud-storage and AI services to a unit within Israel’s Ministry of Defense following its review of surveillance allegations. The company also said its cybersecurity work for Israel continued. The report therefore records a dated, partial restriction alongside an ongoing relationship described in that statement—not a claim that all service provision ended.[2]

US frontier-AI awards: ceilings, not payments

The project’s original evidence includes the CDAO announcement of 14 July 2025, recording awards involving Anthropic, Google, OpenAI and xAI, each with a $200 million ceiling. That source could not be fully re-read for this edition, so the entry remains attributed to the existing project snapshot rather than presented as a fresh procurement audit.[12]

Recorded valueCorrect readingNeeded for an expenditure claim
$200 million per awardMaximum stated award value; not evidence that the full amount was paid.Award identifier, modifications, obligations and disbursement records.
Four award entriesFour named supplier relationships in the July announcement.Separate lifecycle records; an announcement need not mean all awards began that day.
Independent solidarity research · September 202605
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
04 / BDS STRATEGY

Targeted pressure,
not an undifferentiated list

This report supports the Palestinian-led Boycott, Divestment and Sanctions movement. Its stated demands concern ending occupation and colonization and dismantling the Wall; equal rights for Palestinian citizens of Israel; and Palestinian refugees’ return. Its framework is nonviolent and rejects racism, including antisemitism and Islamophobia.[13]

The BDS guide emphasizes focused, strategic pressure. A broad research atlas and a workable campaign list therefore serve different purposes. A dossier can contain hundreds of relationships without instructing an individual to boycott every company in it.[14]

Campaign instrumentSelected examples in the live guideHow this report uses it
Consumer-priority targetsChevron, Intel, Dell, HP, Microsoft, Carrefour, AXA, Reebok, Disney+, Teva, SodaStream and RE/MAX.A movement-selected focus, not an exhaustive list. Microsoft’s campaign also concerns institutional contracts and investment.
Pressure targetsGoogle and Amazon; Booking, Airbnb and Expedia.Collective contract pressure and other feasible actions. Not automatically identical to the consumer-priority category.
Grassroots boycotts supported by BDSExamples include McDonald’s, Coca-Cola and Burger King.Distinguish campaigns supported by the movement from campaigns initiated by it.
Institutional divestment and procurement exclusionExamples include Elbit Systems, Israel Aerospace Industries, Bank Hapoalim, Electra, Netafim, Lockheed Martin and RTX.Use the separate institutional guidance; research the actual holding or contract before making a claim.

Campaign categories above are selected examples, not the complete guide. Source: live BNC consumer/pressure and institutional pages read on 30 September 2026. Their content is dynamic; the original page publication label does not date every later addition.[14, 15]

Keep the campaign claim and the evidence claim separate

“BDS lists this company” establishes a movement position. Claims about a supply contract, military use, payment or legal finding need their own evidence. Brand names, subsidiaries and corporate parents may be different legal entities.

This report also includes computing and banking sites with no demonstrated military workload. Their presence in the infrastructure register does not make them official BDS targets.

Independent solidarity research · September 202606
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
05 / INFRASTRUCTURE

The infrastructure
beneath the brand

“Who runs this data center?” is not a single question. The landholder, developer, general contractor, electrical installer, operator, cloud service provider and tenant can be different organizations. The arrangement can also change between construction, commissioning and routine service.

01
CAPITALEquity investors · lenders · funds
02
DEVELOPMENTLand · grid access · campus delivery
03
CONSTRUCTIONGeneral contractor · EPC joint venture
04
TECHNICAL SYSTEMSElectrical · mechanical · cooling · controls
05
OPERATIONSMaintenance · monitoring · service response
06
CUSTOMERSCloud tenants · public buyers · end users

Ask for a role, a scope and a date

A building contract may include commissioning without including long-term maintenance. A solar project’s operating agreement may cover the solar equipment rather than the data center. A corporate financing round may support several sites without giving the investor title to any particular building.

In the project atlas, these distinctions appear as different relationship types. The facility register at the back preserves them in ordinary language. The sequence shown here is an analytical checklist, not proof that every site has six separate organizations or a single linear chain.

Two useful comparisons

RelationshipExampleWhy the distinction matters
Construction scopeSouthland describes mechanical, plumbing and fire-protection work at Vantage AZ1.[3]This is not a claim that Southland sells the cloud service or chooses workloads.
Continuing technical supportPlan Group describes round-the-clock support at RBC Guelph.[4]Operations and maintenance create continuing institutional relationships beyond a build contract.
Independent solidarity research · September 202607
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
06 / REGIONAL DOSSIERS

Americas: construction
and continuing service

The Americas register spans construction, technical installation and continuing operations. Its value is not a ranking of political responsibility. It shows which specific entities can be researched through project disclosures, contract renewals and institutional records.

Goodyear: owner, builder and technical contractor

Southland’s Vantage AZ1 project page names Vantage as owner and McCarthy as general contractor. Southland describes its own design-build scope in mechanical, plumbing and fire-protection systems. The campus is phased; planned capacity or a later completion date should not be reported as already operating capacity.[3]

Guelph and Toronto: a service relationship versus an expansion

Plan Group’s RBC Guelph account describes three staff and round-the-clock technical support. That is a continuing-service claim. By contrast, Turner’s Serverfarm TOR2.1 account describes a completed expansion: an 8 MW total critical-load design with a 4 MW data-hall buildout within the described work. The smaller construction scope should not be replaced with the larger facility-wide number.[4, 16]

Richland Parish: do not multiply a joint venture

The project snapshot identifies DPR, Turner and Mortenson as construction-joint-venture partners for Meta’s Richland Parish project. Three partner relationships do not establish three separately valued construction awards. The cited contractor page also distinguishes construction beginning in late 2024 from its forecast of operation by 2030; neither a forecast nor a groundbreaking establishes completed capacity.[17]

Brazil and confidential customers

The Brazilian cases name Engemon at Equinix SP3 and Racional at Itaú’s Mogi Mirim campus. These are supplier-described project relationships retained from the snapshot. At the MAZ Mesa project, the snapshot records Rosendin as electrical contractor but does not identify the confidential customer. That missing name is not filled with a guessed hyperscaler.[18, 19, 20]

The ten Americas facilities are listed on page 19. None of these construction records, standing alone, identifies a military computing workload. Where a company has a separately documented military relationship, the two claims must retain separate citations.

Independent solidarity research · September 202608
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
07 / REGIONAL DOSSIERS

Europe: commissioning
is not operations

Commissioning demonstrates that a system was tested or handed over within an agreed scope. Operations demonstrates who runs or services it after that point. Conflating them makes an infrastructure map look more complete than the records actually allow.

Frankfurt and Paris: the scope of Mercury’s delivery

Mercury describes its work at Digital Realty’s FRA17 in Frankfurt and its handover of the Paris Digital Park campus. Its Paris statement, dated 21 October 2025, concerns PAR8–PAR11 with a combined stated capacity of 76 MW. That is a campus-level description, not four independently countable 76 MW sites.[21, 22]

Where a contractor refers to electricity backed by Guarantees of Origin, this report does not translate that statement into proof that every hour of physical power supply was carbon-free. Environmental claims and delivery claims require different supporting records.[22]

Hamar: an expressly named operations contract

CBRE’s 27 February 2024 announcement describes its technical-operations contract for Green Mountain’s Hamar campus, including round-the-clock services. The project’s separate Green Mountain handover source names TikTok as a customer. The operator, technical-services contractor and tenant therefore remain three distinct roles; the report does not infer an undisclosed workload from the tenant’s name.[5, 23]

Rosbach and Groningen: split the technical packages

For FRA7 at Rosbach, the snapshot retains named roles for firstcolo, several SPIE business units and Lupp. For NorthC Groningen, the FireX disclosure differentiates its design, supply and commissioning work from installation by Hamer. A generic offer of maintenance on a supplier’s website is not evidence that the supplier holds the site’s maintenance appointment.[24, 25]

Historical service cases remain historical

The Colt Amsterdam and Roosendaal examples record SPIE’s historical mechanical, electrical and on-site service relationship. They do not certify current ownership or a renewed service contract. The LD10 project remains identified at the level supported by Mercury’s disclosure; the code is not used to guess an owner.[26, 27]

Independent solidarity research · September 202609
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
08 / REGIONAL DOSSIERS

Asia, the Gulf and Israel:
distinct roles

The Asian, Gulf and Israeli dossiers illustrate why a large corporate-group name is not enough. A report must distinguish the joint venture that delivers a building, the firm supplying a specific control system, and the organization responsible for day-to-day service.

Abu Dhabi: EPC delivery and later operational organization

The AUH6 project disclosure names James L Williams Middle East as lead of an engineering, procurement and construction joint venture with McLaren Construction. It also names RED Engineering, BG&E and AESG in design roles. The described first phase is 31.8 MW; the ultimate two-phase 60 MW plan is not presented here as a single completed phase.[28]

Khazna’s February 2026 announcement of NexOps describes bringing operations in-house across its portfolio. This is a portfolio-level statement, not a complete public assignment of every engineer or maintenance package at AUH6. Similarly, a solar operations agreement associated with a campus is not automatically a data-center operations contract.[29, 30]

Sydney: a control system does not equal the entire facility

At NEXTDC S3, Multiplex describes Stage Two construction. The separate Ozuno project account names Heyday5 as electrical contractor and mySmart as systems integrator for the RAPIX lighting-control installation. These are specific packages. Hamer belongs to the Groningen case, not this Sydney project.[31, 32]

Rotem: four Electra divisions and a named bank customer

Electra’s Rotem account identifies Bank Hapoalim as customer and separates Electra Construction, Electra M&E, Electra FK’s backup generators and Electra Elevators. It does not identify a military workload or a present maintenance contractor. Bank Hapoalim and Electra also appear in BDS institutional guidance; that campaign classification is a separate, cited fact.[6, 15]

Elmina: keep two awards separate

The snapshot records Google’s Elmina campus, Sime Darby Property’s development role and Gamuda Engineering’s construction and technical scope. It distinguishes MYR 815 million of construction from MYR 928.6 million of mechanical, electrical and plumbing work. The Gamuda source could not be re-read for this edition; these remain explicitly snapshot-derived award records.[33, 34]

Additional dossiers cover Khazna DXB2, Equinix SG5, Yotta NM1, GASTAT Riyadh and NEXTDC S6. Their named construction and equipment suppliers are listed on page 21; unverified operating roles are not filled in by inference.

Independent solidarity research · September 202610
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
09 / FINANCIAL RECORDS

Follow the money.
Keep the units.

A large figure is only useful when the reader knows what it measures. The following selected records describe a company-wide equity round, a credit facility, project financing, an acquisition valuation and international investment announcements. They do not share an accounting denominator.

Record / dateReported amount and typeInterpretation limit
Crusoe Series D
12 Dec 2024[7]
US$600m
Closed equity round
Round total across participants—not the lead investor’s individual contribution or spending at a single site.
Brookfield → Crusoe
11 Jun 2025[8]
US$750m
Credit facility
Available financing is not a verified drawn balance. The full amount is not assigned to Abilene.
Abilene expanded JV
21 May 2025[9]
US$15bn
Project financing envelope
Shared across sponsors and phases; not each sponsor’s contribution or a spent-to-date figure.
AirTrunk agreement
4 Sep 2024[35]
Over A$24bn
Implied enterprise value
Includes committed-project capital expenditure. Not one investor’s cash payment; announcement and completion are separate events.
Microsoft → G42
15 Apr 2024[36]
US$1.5bn
Announced minority equity investment
Investment relationship, not a complete inventory of subsequent deployments or military uses.
AWS + HUMAIN
13 May 2025[37]
Over US$5bn
Announced joint investment plan
A stated plan, not evidence the entire amount had already been spent.
Gamuda / Elmina
May 2024 snapshot record[33]
MYR 815m construction
MYR 928.6m MEP
Separate award scopes. Do not label their sum as cash already paid or convert currencies without a dated method.

A ledger should preserve uncertainty

The accompanying public-data package retains all 50 financial records with their instrument types, currencies, dates and original caution notes. Some describe proposed arms sales, defense-spending estimates or donor bands rather than infrastructure spending. An export that drops those fields would materially change the meaning of the dataset.

Independent solidarity research · September 202611
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
10 / WORKED EXAMPLE

Abilene: one campus,
several kinds of relationship

Abilene is useful because several layers can be named without pretending they are the same transaction. The 2025 joint-venture announcement names Crusoe, Blue Owl Capital and Primary Digital Infrastructure around a planned 1.2 GW campus development. It describes a $15 billion total project-financing envelope—not three $15 billion contributions.[9]

CrusoeBlue Owl CapitalPrimary DigitalInfrastructuredeveloper / co-sponsorcapital / co-sponsorAbilene campus$15bn JV / announced May 2025Lanciumland / power developmentOracle / OCIcloud infrastructureOpenAIreported early workloads

Figure 1. Roles are schematic; line width does not represent money, ownership percentage or traffic. Campus financing, land/power development and cloud use are different relationships.[9, 38, 39]

A facility chain is not an ownership shortcut

The project’s Lancium record concerns land and power development. Its OpenAI source describes early training and inference on Oracle Cloud Infrastructure at Abilene. Neither record is treated as evidence that a customer owns the land, that the full planned campus is operational, or that every future phase has the same ownership and tenant arrangement.[38, 39]

The separate Crusoe Series D disclosure names Founders Fund as lead investor, with other participants including Mubadala and NVIDIA. It concerns the company rather than a proven proportional interest in the Abilene buildings. Brookfield’s credit facility is another company financing relationship, not a reason to draw a $750 million direct-payment line to one site.[7, 8]

Independent solidarity research · September 202612
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
11 / POLICY AND CAPITAL

Who supports the
policy conversation?

Policy research and infrastructure finance overlap through publicly disclosed support. Those disclosures are legitimate objects of scrutiny. They do not, on their own, establish that a donor dictated a conclusion, selected an author or controlled an institute’s editorial decisions.

CNAS: separate entities and contribution bands

The Center for a New American Security lists supporters for 1 October 2024–30 September 2025. Its disclosure places AWS in the $100,000–249,999 band and Microsoft in the $50,000–99,999 band. Amazon.com is listed separately; it should not be substituted for AWS or used to infer an exact combined payment. CNAS also states a policy of intellectual independence.[40]

ITIF: a threshold, not an exact gift

The Information Technology and Innovation Foundation’s supporters page names Microsoft and Anthropic among supporters above $10,000 in the described past fiscal year. The page does not provide an exact contribution for those companies or a specific allocation to a particular publication. This report preserves that threshold and the page’s period description rather than inventing a precise fiscal year or gift.[41]

Supported statementUnsupported leap
An institute names a company as a donor within a band or above a threshold.The company purchased a specific conclusion.
The institute publishes on an issue affecting the donor’s business.The donor directed that paper or all the institute’s work.
Donor concentration may be relevant to a governance inquiry.Every researcher at the institute shares a donor’s interests or intent.

A useful transparency demand

This report proposes publication-level funding statements, clear conflict-of-interest disclosures, dated donor registers and accessible descriptions of editorial safeguards. When an institution advises on data-center planning, energy demand or public procurement, its methods and assumptions should be independently readable even when its funders favor a particular outcome.

Venture equity, infrastructure debt and institute donations confer different rights. They belong in the same accountability conversation, but not in the same relationship category.

Independent solidarity research · September 202613
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
12 / ECOLOGICAL COSTS

The cloud has
a material footprint

An aerial view of Google’s Eemshaven data center, with wind turbines and other industrial infrastructure in the surrounding landscape.Photograph loading from this report.
Eemshaven, Netherlands, January 2023. The photograph shows co-located industrial infrastructure; it does not establish a particular power-purchase arrangement, emissions intensity or military use. Photo: Wvdp · CC0 1.0. Full credit and modifications: photo register.

Cloud services require electricity, cooling systems, equipment and land. The IEA’s 2025 assessment estimates data-center electricity consumption at 415 TWh in 2024, around 1.5% of global electricity use. Its Base Case projects 945 TWh in 2030. These figures cover data centers overall, not AI alone.[10]

Figure 2. A historical estimate and a scenario projection—not two observed years. Scale begins at zero. Source: IEA, Energy and AI, 2025.[10]

Measure the burden at the place it occurs

A useful facility dossier would add metered electricity, the relevant grid mix, water withdrawals and consumption by season, backup generation, construction impacts and equipment replacement. These are proposed reporting fields; this edition does not supply verified measurements for all 29 sites.

AI may enable efficiency improvements in some activities, but potential savings are not automatic offsets against the infrastructure used to deliver them. The IEA discusses both opportunities and uncertainty. Public planning should test local capacity, demand growth and distributional effects rather than relying only on company-wide “green” branding.[10]

Independent solidarity research · September 202614
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
13 / LAND AND WAR

The destruction of land
is not an externality

Environmental accounting cannot separate warfare from the conditions of life it damages. Nor should it make the losses of a displaced or occupied population interchangeable with a corporate carbon target. Climate, water, soil, food and control over land require connected—but distinct—forms of accountability.

Military fuel and the long tail of contamination

Neta C. Crawford’s Brown University study estimates 1.2 billion metric tonnes of US military greenhouse-gas emissions across 2001–2017. This is a cumulative historical estimate, not one year’s emissions or a 2026 footprint.[42]

GAO’s 2025 report states that the Department of Defense estimated more than $9.3 billion in future PFAS investigation and cleanup costs for fiscal 2025 and beyond. This is projected cleanup cost, not an annual appropriation or proof the work has been completed. The GAO page’s later recommendation-status update should not be confused with the physical completion of remediation.[43]

Gaza: agriculture and ecological recovery

UNEP’s 23 September 2025 assessment reported the loss of approximately 97% of tree crops, 95% of shrubland and 82% of annual crops in Gaza since 2023. UNEP also described severe harm to soil, water and food-production systems. The assessment relied on remote sensing and other available evidence; its teams had not been able to enter Gaza. These are dated assessment findings, not a fresh 2026 field survey.[11]

This report’s political position is that recovery must restore people’s ability to live, cultivate and decide the future of their land. A remote planting project cannot substitute for ending destructive practices or compensate for displacement and loss of self-determination.

EvidenceBoundary to preservePractical implication proposed here
Military emissions estimateCumulative, historical, defined institutional scope.Disclose and reduce military resource demand; do not label it a current annual total.
Future contamination costsProjected costs are not completed remediation.Track actual cleanup milestones, funding and community oversight.
Damage to agricultural landDated assessment with access limitations.Support locally accountable recovery, land rights and safe restoration—not a generic offset.
Independent solidarity research · September 202615
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
14 / REGENERATION

Regeneration needs
evidence—and people

Green planted terraces and a tree at the historical Hayes Valley Farm site in San Francisco.Photograph loading from this report.
Hayes Valley Farm, San Francisco, March 2010. A historical example of urban cultivation, not one of the farms in the cited study and not evidence of the site’s present condition. Photo: Zoey Kroll · CC BY-SA 3.0. Full credit and modifications: photo register.

Divestment changes financial holdings. A levy raises revenue. Neither automatically creates the land access, practical knowledge or dependable paid work required for ecological repair. The destination of resources therefore needs its own evidence and governance.

A promising result—with a defined scope

The project’s research base includes Reiff and colleagues’ 2024 comparison of nine Central European permaculture farms with paired fields under locally predominant agriculture. It reports 27% higher soil carbon stocks in the permaculture comparison. This is a stock comparison, not an annual removal rate, proof of causation in every setting, or a forecast for all farms. The entry is retained from the project’s prior source review.[44]

Fund the work, not only the headline

The proposed fund would support locally suitable agricultural research, restoration, food production, training and long-term stewardship. Soil measurement, water access, ecological monitoring and maintenance are work. They should appear in budgets as paid roles rather than being assigned indefinitely to volunteers.

A project claiming net carbon removal would need a stated boundary and period, baseline, measurement method, treatment of emissions and uncertainty, and a plan for losses or reversal. Biodiversity gains, food access, heat relief and secure livelihoods deserve separate reporting rather than being reduced to a single carbon number. These are proposed evaluation requirements, not measured results of a fund that already exists.

Independent solidarity research · September 202616
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
15 / INDEPENDENT POLICY PROPOSAL

An ecological levy
with community control

The project proposes a mandatory levy on AI companies and data-center activity, with receipts ring-fenced for community-controlled ecological repair, agricultural research and lasting paid work. No rate, revenue forecast or enacted legal authority is claimed. The mechanism is not an official BDS policy.

A four-photograph montage showing gardens and cultivation at the Greening the Desert II site in Jordan. It is not presented as a before-and-after comparison.Photograph loading from this report.
Greening the Desert II, Jordan. An illustrative cultivation montage—not a before-and-after trial, a carbon audit or a fund beneficiary. Photo: Jengod · CC BY-SA 4.0. Full credit and modifications: photo register.

Three separate duties

Reduce harm. Binding impact reductions remain necessary; contributions do not authorize unrestricted growth or military activity.

Finance repair. An accountable public mechanism collects and allocates resources. It is not a voluntary corporate charity program.

Share control. Affected communities and workers should have meaningful decision-making power, not only a consultative role.

Design choiceProposed safeguard
Who paysDefine covered entities, activities, exemptions, cross-border treatment and anti-avoidance rules. Make any intended multiple assessment within corporate groups explicit.
What is taxedEvaluate revenue, resource-use and impact-based options. Publish distributional effects and risks of shifting costs onto workers or essential services.
Who decidesIndependent public administration; accountable community and worker participation; conflict disclosures and an appeal mechanism.
How funds are usedPublish awards, paid roles, land-tenure safeguards, monitoring methods and maintenance obligations. No donor veto and no privately owned “credit” that excuses further harm.
How results are checkedUse project-specific baselines and independent review. Publish failures and uncertainty alongside achievements; separate carbon, biodiversity, water and social outcomes.

Before enactment, the proposal needs jurisdiction-specific tax and public-finance analysis, consultation, enforceable collection rules and an administrative cost model. This report proposes a policy direction; it is not legal or tax advice.

Independent solidarity research · September 202617
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
16 / COLLECTIVE PRACTICE

From disclosure
to collective decisions

A network becomes politically useful when it helps people make a decision together. The most actionable unit is often one institution, one contract or holding, one responsible body and one clear demand—not a promise to untangle every global relationship at once.

Build a small evidence packet

Record the institution’s exact relationship; the relevant BDS campaign position; the source for any asserted military or occupation-related role; the contract or holding date; and the requested decision. Mark missing information. Make the packet readable to someone who has not seen the website, and preserve the source links when sharing it.

StepA practical output
1 / ConnectContact a Palestinian-led or allied effort already working on the issue. Agree on an accessible meeting format and a manageable division of work.
2 / VerifyIdentify the actual supplier or security held. Save the dated source and distinguish the company’s account from independent research.
3 / DemandName the decision-maker and one requested action: disclosure, review, a renewal decision, procurement exclusion or divestment.
4 / Build the alternativeMap practical transition needs, worker protections and essential-service continuity. Keep paid ecological work and community control in view.
5 / Return and correctPublish the response, record changes and correct errors. Review the campaign guidance and the underlying contract when either changes.

Conclusion: withdraw support, build capacity

The project’s political position is to divest from US imperial power, military domination and ecological destruction while expanding collective capacity to sustain life. That means focused BDS solidarity, transparent institutional decisions, reduced harmful demand, and a credible destination for resources: land care, food systems, public knowledge, secure livelihoods and democratic control.

Independent solidarity research · September 202618
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
APPENDIX A / FACILITY REGISTER

Americas

Selected public project disclosures from the 28 September 2026 snapshot. Names are supplied at the role level supported by the record; this is not a list of proven military-processing sites. Additional source checks are marked in the source register.

Facility / countryNamed relationshipBoundary
Abilene / Lancium campus
United States
Crusoe, Blue Owl and Primary Digital Infrastructure: JV sponsors. Lancium: land/power. Oracle / OpenAI: separately recorded cloud infrastructure and use.[9, 39]Financing, development and use do not establish identical ownership.
Digital Realty / Toronto Star conversion
Canada
Digital Realty: named client/operator; Plan Group: electrical/technology; EllisDon and HITT: named construction clients.[45, 46]Historical conversion record; do not merge differently labeled sites without records.
Meta / Richland Parish
United States
Meta: client; DPR, Turner and Mortenson: construction JV.[17]One JV, not three separately valued contracts. Future operation is a forecast.
Vantage AZ1 / Goodyear
United States
Vantage: owner; McCarthy: general contractor; Southland: mechanical, plumbing, fire protection.[3]Phased project; planned capacity is not all operating capacity.
Equinix SP3
Brazil
Equinix: operator; Engemon: turnkey project delivery.[18]Supplier project account; no military workload established.
Itaú / Mogi Mirim
Brazil
Itaú: client; Racional: construction.[19]Historic project scope, not current maintenance certification.
MAZ / Mesa
United States
Rosendin: electrical contractor.[20]Customer is confidential; no hyperscaler is guessed.
RBC / Guelph
Canada
Royal Bank of Canada: computing facility; Plan Group: continuing technical support.[4]Service disclosure does not assign facility ownership to the contractor.
Serverfarm TOR2.1
Canada
Serverfarm: client; Turner: completed expansion.[16]8 MW design and 4 MW data-hall buildout are distinct scopes.
Yahoo / Lockport
United States
Yahoo: historical client; Cupertino Electric: electrical design/construction.[47]Historic name and project do not establish present owner or contractor.

The accompanying structured-data register includes all 29 facility records and their original source identifiers. Project-wide gaps and unverified roles should be preserved when these records are reused.

Independent solidarity research · September 202619
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
APPENDIX A / FACILITY REGISTER

Europe

Selected public project disclosures from the 28 September 2026 snapshot. Names are supplied at the role level supported by the record; this is not a list of proven military-processing sites. Additional source checks are marked in the source register.

Facility / countryNamed relationshipBoundary
FRA7 / Rosbach
Germany
firstcolo: client; SPIE units: delivery, electrical, mechanical, power, IT and commissioning; Lupp: building.[24]Keep legal business units and technical scopes separate.
FRA17 / Fechenheim
Germany
Digital Realty: client; Mercury: prime and mechanical/electrical delivery.[21]Construction completion is not a maintenance award.
NorthC Groningen
Netherlands
NorthC: operator; Hamer: contractor/installation; FireX: design, supply and commissioning.[25]Do not infer a maintenance appointment from a services menu.
OSL-Hamar
Norway
Green Mountain: developer/operator; CTS Nordics: general contractor; CBRE: technical operations; TikTok: named customer.[23, 5]Customer and service-contractor roles are different.
Colt Amsterdam
Netherlands
Colt: historical client; SPIE: mechanical/electrical maintenance and on-site services.[26]Historical service case, not a claim of a current contract.
Colt Roosendaal
Netherlands
Colt: historical client; SPIE: maintenance and on-site services.[26]Same source covers two sites; do not duplicate a portfolio contract value.
Mentor Graphics / County Clare
Ireland
Mentor Graphics: historical client; Winthrop: turnkey and M&E delivery.[48]Present ownership and service appointments are not established here.
Paris Digital Park / PAR8–PAR11
France
Digital Realty: client; Mercury: general, MEP and commissioning.[22]Combined 76 MW campus statement, not 76 MW per building.
SVG-Rennesøy
Norway
Green Mountain: operator; Schneider Electric: cooling-system design/infrastructure.[49]Equipment/system role is not automatically whole-facility operations.
LD10 / London project
United Kingdom
Mercury: fit-out, MEP and fire protection.[27]No owner is inferred from the project code.

The accompanying structured-data register includes all 29 facility records and their original source identifiers. Project-wide gaps and unverified roles should be preserved when these records are reused.

Independent solidarity research · September 202620
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
APPENDIX A / FACILITY REGISTER

Asia, Gulf & Israel

Selected public project disclosures from the 28 September 2026 snapshot. Names are supplied at the role level supported by the record; this is not a list of proven military-processing sites. Additional source checks are marked in the source register.

Facility / countryNamed relationshipBoundary
Khazna AUH6
United Arab Emirates
Khazna: client; JLW / McLaren JV: EPC; RED, BG&E and AESG: design. Emerge: separate solar scope.[28, 30]Phase-one delivery and solar operations do not equal all campus operations.
NEXTDC S3 / Sydney
Australia
NEXTDC: client; Multiplex: Stage Two; Heyday5: electrical; mySmart: lighting integration; Ozuno: RAPIX.[31, 32]Technical-control package is narrower than whole-site operations.
Rotem / Bank Hapoalim
Israel
Bank Hapoalim: client; Electra Construction, M&E, FK and Elevators: distinct packages.[6]No military workload or current maintenance appointment established.
Elmina Business Park 1A
Malaysia
Google: campus; Sime Darby Property: developer; Gamuda Engineering: construction, testing and MEP.[33, 34]Award scopes remain separate; Gamuda source not re-read for this edition.
Khazna DXB2 / D3
United Arab Emirates
Khazna: client; Laing O’Rourke Middle East: construction; Assent: steel; GHD: consultant.[50]Supplier disclosure identifies packages, not workload or ownership shares.
Yotta NM1
India
Yotta: operator; India Electricals Syndicate: cable management/grounding; Sterling & Wilson: EPC attribution.[51]EPC role is attributed through a supplier’s disclosure.
Equinix SG5
Singapore
Equinix: operator; Master Construction Works: plumbing and cooling-water transfer.[52]A defined plumbing package, not the complete contractor roster.
GASTAT Riyadh
Saudi Arabia
General Authority for Statistics: client; Alfanar: civil, cabling and electromechanical scope.[53]Government customer does not automatically mean military use.
NEXTDC S6 / Sydney
Australia
NEXTDC: client; Multiplex: managing contractor for phase one / stage one.[54]Phase and stage limits must accompany the relationship.

The accompanying structured-data register includes all 29 facility records and their original source identifiers. Project-wide gaps and unverified roles should be preserved when these records are reused.

Independent solidarity research · September 202621
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
APPENDIX B / SOURCES 1 OF 5

Follow the record

Read 30 Sep means the source was additionally read for this edition. Snapshot means it is cited from the project’s earlier record, without a complete new verification. Corporate sources remain corporate accounts. Campaign sources establish movement positions. Links may change after publication.

01
Nimbus: suppliers and participating institutions

Israel Government Procurement Administration · Undated / date in title where shown

Read 30 Sep 2026mr.gov.il
02
Partial service suspension following its review

Microsoft / 25 September 2025 · Undated / date in title where shown

Read 30 Sep 2026blogs.microsoft.com
03
Vantage AZ1: construction scope and project partners

Southland Industries · Undated / date in title where shown

Read 30 Sep 2026southlandind.com
04
Royal Bank of Canada: site support at Guelph Computing Centre

Plan Group · Undated / date in title where shown

Read 30 Sep 2026www.plan-group.com
05
Datasentersatsning på Hamar

CBRE Norway · 2024-02-27

Read 30 Sep 2026www.cbre.no
06
Data Center Rotem — Bank Hapoalim

Electra Group · Undated / date in title where shown

Read 30 Sep 2026www.electra.co.il
07
Crusoe closes USD 600 million Series D

Crusoe · 2024-12-12

Read 30 Sep 2026www.crusoe.ai
08
Crusoe secures USD 750 million credit facility

Crusoe · 2025-06-11

Read 30 Sep 2026www.crusoe.ai
09
Abilene joint venture expands to USD 15 billion

Crusoe · 2025-05-21

Read 30 Sep 2026www.crusoe.ai
10
Energy and AI: executive summary

International Energy Agency · 2025

Read 30 Sep 2026www.iea.org
11
Environmental damage in the Gaza Strip is harming human health and threatening long-term food and water security

United Nations Environment Programme · 2025-09-23

Read 30 Sep 2026www.unep.org
12
Frontier AI awards: four ceilings of $200 million

CDAO / 14 July 2025 · Undated / date in title where shown

Snapshot: 28 Sep 2026www.ai.mil
Independent solidarity research · September 202622
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
APPENDIX B / SOURCES 2 OF 5

Follow the record

Read 30 Sep means the source was additionally read for this edition. Snapshot means it is cited from the project’s earlier record, without a complete new verification. Corporate sources remain corporate accounts. Campaign sources establish movement positions. Links may change after publication.

13
What is BDS?

Palestinian BDS National Committee · Undated / date in title where shown

Read 30 Sep 2026bdsmovement.net
14
BNC live guide to consumer boycotts and pressure campaigns

Palestinian BDS National Committee · Undated / date in title where shown

Read 30 Sep 2026bdsmovement.net
15
BNC institutional divestment and procurement-exclusion priorities

Palestinian BDS National Committee · Undated / date in title where shown

Read 30 Sep 2026bdsmovement.net
16
Serverfarm TOR2.1 Data Center

Turner Construction Company · Undated / date in title where shown

Read 30 Sep 2026www.turnerconstruction.com
17
Meta Richland Parish Data Center

DPR Construction · Undated / date in title where shown

Snapshot: 28 Sep 2026www.dpr.com
18
Equinix SP3: turnkey construction

Engemon · Undated / date in title where shown

Snapshot: 28 Sep 2026engemon.com.br
19
Centro Tecnológico Itaú

Racional Engenharia · Undated / date in title where shown

Snapshot: 28 Sep 2026racional.com
20
MAZ Mesa Data Center: confidential client

Rosendin · Undated / date in title where shown

Snapshot: 28 Sep 2026www.rosendin.com
21
Mercury completes FRA17 on Digital Realty’s Frankfurt campus

Mercury · 2023-06-23

Read 30 Sep 2026www.mercuryeng.com
22
Handover of Paris Digital Park campus to Digital Realty

Mercury · 2025-10-21

Read 30 Sep 2026www.mercuryeng.com
23
Green Mountain delivers first data-center building to TikTok

Green Mountain · 2023-11-30

Snapshot: 28 Sep 2026greenmountain.no
24
SPIE builds AI-enabled data centre for firstcolo in Rosbach vor der Höhe

SPIE · 2026-06-30

Snapshot: 28 Sep 2026www.spie.com
Independent solidarity research · September 202623
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
APPENDIX B / SOURCES 3 OF 5

Follow the record

Read 30 Sep means the source was additionally read for this edition. Snapshot means it is cited from the project’s earlier record, without a complete new verification. Corporate sources remain corporate accounts. Campaign sources establish movement positions. Links may change after publication.

25
NorthC Datacenter, Groningen

FireX · Undated / date in title where shown

Snapshot: 28 Sep 2026www.firex.nl
26
Efficiënt onderhoud en beheer van datacenters bij Colt Technology Services

SPIE Netherlands · Undated / date in title where shown

Snapshot: 28 Sep 2026www.spie-nl.com
27
LD10 Data Centre

Mercury · Undated / date in title where shown

Snapshot: 28 Sep 2026www.mercuryeng.com
28
Khazna AUH6 — EPC project record

James L. Williams Middle East · Undated / date in title where shown

Read 30 Sep 2026jlwme.com
29
Khazna announces its in-house NexOps organization

Khazna Data Centers · 2026-02-09

Read 30 Sep 2026khaznadatacenters.com
30
Emerge agreement for Khazna AUH6 solar plant

Masdar · 2022-10-18

Snapshot: 28 Sep 2026masdar.ae
31
Multiplex completes Stage Two of NEXTDC S3 Sydney

Multiplex · 2023-06-14

Read 30 Sep 2026www.multiplex.global
32
NEXTDC S3 Artarmon Sydney — project snapshot

Ozuno · 2023-04-28

Read 30 Sep 2026ozuno.com
33
Gamuda secures contracts for Elmina Business Park hyperscale data centre

Gamuda Berhad · 2024-05-24

Snapshot: 28 Sep 2026gamuda.com
34
Sime Darby Property widens industrial footprint with Elmina Business Park 2

Sime Darby Property · 2026-04-13

Snapshot: 28 Sep 2026www.simedarbyproperty.com
35
AirTrunk acquisition agreement and valuation basis

Blackstone · 2024-09-04

Read 30 Sep 2026www.blackstone.com
36
Microsoft announces minority investment in G42

Microsoft · 2024-04-15

Read 30 Sep 2026blogs.microsoft.com
Independent solidarity research · September 202624
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
APPENDIX B / SOURCES 4 OF 5

Follow the record

Read 30 Sep means the source was additionally read for this edition. Snapshot means it is cited from the project’s earlier record, without a complete new verification. Corporate sources remain corporate accounts. Campaign sources establish movement positions. Links may change after publication.

37
AWS and HUMAIN: Saudi AI Zone investment announcement

Amazon / AWS · 2025-05-13

Read 30 Sep 2026press.aboutamazon.com
38
Lancium and Crusoe explain their campus partnership model

Lancium · 2026-07-15

Snapshot: 28 Sep 2026lancium.com
39
Stargate expansion and initial Abilene workloads

OpenAI · 2025-09-23

Snapshot: 28 Sep 2026openai.com
40
CNAS supporters, October 2024–September 2025

CNAS · Undated / date in title where shown

Read 30 Sep 2026www.cnas.org
41
ITIF supporters disclosure

ITIF · Undated / date in title where shown

Read 30 Sep 2026itif.org
42
Pentagon fuel use, climate change and the costs of war

Neta C. Crawford / Brown / 2019 · Undated / date in title where shown

Read 30 Sep 2026costsofwar.watson.brown.edu
43
DOD Environmental Cleanup: Information on Costs, Priorities, and Progress (GAO-25-107401)

US Government Accountability Office · 2025-02

Read 30 Sep 2026www.gao.gov
44
Permaculture: carbon stocks, soil and biodiversity

Reiff et al. / 2024 · Undated / date in title where shown

Snapshot: 28 Sep 2026www.nature.com
45
Digital Realty Data Centre: Toronto Star conversion

Plan Group · Undated / date in title where shown

Snapshot: 28 Sep 2026www.plan-group.com
46
Digital Realty TOR1: newspaper-plant conversion

EllisDon · Undated / date in title where shown

Snapshot: 28 Sep 2026www.ellisdon.com
47
Yahoo! Buffalo: electrical design and construction

Cupertino Electric · Undated / date in title where shown

Snapshot: 28 Sep 2026www.cei.com
48
Mentor Graphics turnkey data-centre project

Winthrop Technologies · Undated / date in title where shown

Snapshot: 28 Sep 2026winthrop.ie
Independent solidarity research · September 202625
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
APPENDIX B / SOURCES 5 OF 5

Follow the record

Read 30 Sep means the source was additionally read for this edition. Snapshot means it is cited from the project’s earlier record, without a complete new verification. Corporate sources remain corporate accounts. Campaign sources establish movement positions. Links may change after publication.

49
Green Mountain creates data-center harmony with nature

Schneider Electric · 2015-10-01

Snapshot: 28 Sep 2026blog.se.com
50
Khazna Data Centre Dubai — structural steel package

Assent Steel · Undated / date in title where shown

Snapshot: 28 Sep 2026www.assentsteel.com
51
Yotta NM1 — cable management and earthing supply case

India Electricals Syndicate · Undated / date in title where shown

Snapshot: 28 Sep 2026indiaelectricals.net
52
Equinix Data Center SG5 — project portfolio

Master Construction Works · Undated / date in title where shown

Snapshot: 28 Sep 2026mastergroup.sg
53
GASTAT Data Center Project

Alfanar Projects · Undated / date in title where shown

Snapshot: 28 Sep 2026alfanarprojects.com
54
NEXTDC S6 Sydney Phase 1 Stage 1

Multiplex · Undated / date in title where shown

Snapshot: 28 Sep 2026www.multiplex.global
Independent solidarity research · September 202626
DIVESTMENT & THE LIVING WORLDRESEARCH REPORT / 01
APPENDIX C / PHOTOGRAPHS AND REUSE

Photo register & colophon

All four photographs are real, independently published images with Creative Commons permissions verified on their Wikimedia Commons file pages on 30 September 2026. No image from the Oakland reference report has been copied. Photographs supply visual context, not evidence of a contract, military workload, carbon result or current facility condition.

Google Data Center — The Dalles, Oregon

Tony Webster · 17 May 2015
Original file page and attribution record · CC BY 2.0

Cropped to a panoramic frame in the cover layout; resized. No generative alteration.

Google data center and wind turbines in Eemshaven

Wvdp · 6 January 2023
Original file page and attribution record · CC0 1.0

Cropped to a panoramic frame; resized. No generative alteration.

Hayes Valley Farm — fava hillside

Zoey Kroll · 21 March 2010
Original file page and attribution record · CC BY-SA 3.0

Cropped to a panoramic frame; resized. The photographic adaptation retains CC BY-SA 3.0. No generative alteration.

Greening the Desert II site, Dead Sea Valley, Jordan

Jengod · Capture date not established; uploaded 27 April 2023. The filename contains “2018”.
Original file page and attribution record · CC BY-SA 4.0

Resized without cropping the montage. Any photographic adaptation retains CC BY-SA 4.0. No generative alteration.

Reuse, access and privacy

Retain the image credits, source links, license links and modification notices. Photographic adaptations marked ShareAlike retain their stated license; no photographer endorses this report. CC0 is a public-domain dedication, not an attribution license. Third-party text and trademarks retain their own rights; this report does not relicense the project’s older source materials.