{"entity":{"id":"itau-mogi-mirim-data-center","slug":"itau-mogi-mirim-data-center","name":"Itaú · Mogi Mirim campus","kind":"facility","countryCodes":["BR"],"region":"Latin America","summary":"Bank computing campus with a 2014 construction record.","description":"Racional describes two data centers completed in the first phase. The facility is not classified as an AI or military installation by this evidence.","sourceIds":["fa-src-itau-mogi-mirim"],"theme":"infrastructure","origin":"global","reviewedAt":"2026-09-28"},"connections":[{"id":"fa-itau-client","sourceId":"itau-unibanco","targetId":"itau-mogi-mirim-data-center","label":"Bank construction client","kind":"facility_client","description":"The 2014 project record identifies Itaú as client.","sourceIds":["fa-src-itau-mogi-mirim"],"recordIds":[],"status":"documented","date":null,"theme":"infrastructure"},{"id":"fa-itau-builder","sourceId":"racional-engenharia","targetId":"itau-mogi-mirim-data-center","label":"Design coordination and construction","kind":"general_construction","description":"Racional managed design execution and construction; the recorded first phase was completed in 2014.","sourceIds":["fa-src-itau-mogi-mirim"],"recordIds":[],"status":"documented","date":null,"theme":"infrastructure"},{"id":"fa-location-itau-mogi-mirim-data-center","sourceId":"itau-mogi-mirim-data-center","targetId":"country-br","label":"Physical project location","kind":"located_in","description":"Geographic relationship only; it does not establish government funding, military use or a political alliance.","sourceIds":["fa-src-itau-mogi-mirim"],"recordIds":[],"status":"documented","date":null,"theme":"infrastructure"},{"id":"proposal-facility-levy-itau-mogi-mirim-data-center","sourceId":"itau-mogi-mirim-data-center","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[],"sources":[{"id":"fa-src-itau-mogi-mirim","title":"Centro Tecnológico Itaú","url":"https://racional.com/pt-br/obras/centro-tecnologico-itau","publisher":"Racional Engenharia","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary_project_record","note":"Portuguese contractor case study: first phase and two data centers completed in 2014. This is a bank computing facility; the record does not establish an AI workload or military contract."}],"neighbors":[{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"country-br","slug":"country-br","name":"Brazil","kind":"country"},{"id":"itau-unibanco","slug":"itau-unibanco","name":"Itaú Unibanco","kind":"company"},{"id":"racional-engenharia","slug":"racional-engenharia","name":"Racional Engenharia","kind":"contractor"},{"id":"itau-mogi-mirim-data-center","slug":"itau-mogi-mirim-data-center","name":"Itaú · Mogi Mirim campus","kind":"facility"}],"gaps":[],"snapshotDate":"2026-09-28"}