GASTAT Riyadh data center

Completed statistics-agency center with disclosed civil, cabling and electromechanical work.

Alfanar marks the project completed without a date; Uptime’s facility register identifies Riyadh. These records do not establish an AI tenant, military use or current O&M provider.

Follow a relationship.

Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.

documented

Located in Saudi Arabia

GASTAT Riyadh data center → Saudi Arabia

A physical location relationship; it does not assign ownership or financing to the national government.

Date not isolated · located in

documented

Project client

General Authority for Statistics → GASTAT Riyadh data center

Named civilian statistics-agency client; no separate operator is identified.

Date not isolated · project client

documented

Civil, cabling and electromechanical works

Alfanar Projects → GASTAT Riyadh data center

Contractor states the project is completed; completion date is not provided.

Date not isolated · mep contractor

proposal

Proposed data-center levy scope

GASTAT Riyadh data center → AI companies & data-center operators

This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.

Date not isolated · proposed levy coverage

What remains unresolved.

Nine disclosed sites are a starting point

This layer covers selected buildings and campuses in seven jurisdictions. It is not a census of regional facilities or evidence that every site hosts AI or military workloads.

Next research step: Add facility-level permits, utility records, disclosed subcontractors and dated handovers. Keep operating sites, contracted phases and proposed expansions distinct.

Sources in this record.

  1. Multiplex completes Stage Two of NEXTDC S3 SydneyMultiplex · 2023-06-14 · source access 2026-09-28

    Contractor completion statement: Stage Two; Stage One was already occupied during these works.

  2. Gamuda secures contracts for Elmina Business Park hyperscale data centreGamuda Berhad · 2024-05-24 · source access 2026-09-28

    Separate construction and MEP awards. Original target dates are not evidence of actual completion or payments.

  3. Equinix expands its fifth Singapore data center, SG5Equinix · 2022-04-21 · source access 2026-09-28

    SG5 is a specific nine-storey facility in Tanjong Kling. Expansion announcement is not a disbursement account.

  4. Inside Yotta NM1Yotta · 2024-11-27 · source access 2026-09-28

    Operator account of the named Navi Mumbai building, on-site management and Shakti Cloud. Marketing performance/sustainability claims are not adopted as independent measurements.

  5. Khazna launches AUH6 in Masdar CityKhazna Data Centers · 2024-02-06 · source access 2026-09-28

    Operator launch identifies location, AI-related hosting and 31.8MW IT capacity; no individual hyperscaler tenant is named.

  6. GASTAT Data Center ProjectAlfanar Projects · Publication date not isolated · source access 2026-09-28

    Contractor labels the project completed and gives civil/electromechanical/cabling scope; completion date and current O&M provider are not disclosed.

  7. GaStat Data Center — facility award registerUptime Institute · Publication date not isolated · source access 2026-09-28

    Facility entry identifies Riyadh, Saudi Arabia; location corroboration only, not a military or AI-use claim.

  8. Data Center Rotem — Bank HapoalimElectra Group · Publication date not isolated · source access 2026-09-28

    Separately names construction, M&E, backup-generator and elevator roles. Current maintenance assignments are not given.