Middle East / facility / reviewed 2026-09-28
GASTAT Riyadh data center
Completed statistics-agency center with disclosed civil, cabling and electromechanical work.
Alfanar marks the project completed without a date; Uptime’s facility register identifies Riyadh. These records do not establish an AI tenant, military use or current O&M provider.
Follow a relationship.
Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.
Located in Saudi Arabia
GASTAT Riyadh data center → Saudi Arabia
A physical location relationship; it does not assign ownership or financing to the national government.
Date not isolated · located in
Project client
General Authority for Statistics → GASTAT Riyadh data center
Named civilian statistics-agency client; no separate operator is identified.
Date not isolated · project client
Civil, cabling and electromechanical works
Alfanar Projects → GASTAT Riyadh data center
Contractor states the project is completed; completion date is not provided.
Date not isolated · mep contractor
Proposed data-center levy scope
GASTAT Riyadh data center → AI companies & data-center operators
This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.
Date not isolated · proposed levy coverage
What remains unresolved.
Nine disclosed sites are a starting point
This layer covers selected buildings and campuses in seven jurisdictions. It is not a census of regional facilities or evidence that every site hosts AI or military workloads.
Next research step: Add facility-level permits, utility records, disclosed subcontractors and dated handovers. Keep operating sites, contracted phases and proposed expansions distinct.
Sources in this record.
- Multiplex completes Stage Two of NEXTDC S3 SydneyMultiplex · 2023-06-14 · source access 2026-09-28
Contractor completion statement: Stage Two; Stage One was already occupied during these works.
- Gamuda secures contracts for Elmina Business Park hyperscale data centreGamuda Berhad · 2024-05-24 · source access 2026-09-28
Separate construction and MEP awards. Original target dates are not evidence of actual completion or payments.
- Equinix expands its fifth Singapore data center, SG5Equinix · 2022-04-21 · source access 2026-09-28
SG5 is a specific nine-storey facility in Tanjong Kling. Expansion announcement is not a disbursement account.
- Inside Yotta NM1Yotta · 2024-11-27 · source access 2026-09-28
Operator account of the named Navi Mumbai building, on-site management and Shakti Cloud. Marketing performance/sustainability claims are not adopted as independent measurements.
- Khazna launches AUH6 in Masdar CityKhazna Data Centers · 2024-02-06 · source access 2026-09-28
Operator launch identifies location, AI-related hosting and 31.8MW IT capacity; no individual hyperscaler tenant is named.
- GASTAT Data Center ProjectAlfanar Projects · Publication date not isolated · source access 2026-09-28
Contractor labels the project completed and gives civil/electromechanical/cabling scope; completion date and current O&M provider are not disclosed.
- GaStat Data Center — facility award registerUptime Institute · Publication date not isolated · source access 2026-09-28
Facility entry identifies Riyadh, Saudi Arabia; location corroboration only, not a military or AI-use claim.
- Data Center Rotem — Bank HapoalimElectra Group · Publication date not isolated · source access 2026-09-28
Separately names construction, M&E, backup-generator and elevator roles. Current maintenance assignments are not given.