{"entity":{"id":"gastat-riyadh-data-center","slug":"gastat-riyadh-data-center","name":"GASTAT Riyadh data center","kind":"facility","summary":"Completed statistics-agency center with disclosed civil, cabling and electromechanical work.","description":"Alfanar marks the project completed without a date; Uptime’s facility register identifies Riyadh. These records do not establish an AI tenant, military use or current O&M provider.","countryCodes":["SA"],"region":"Middle East","theme":"infrastructure","sourceIds":["fam-src-gastat-alfanar","fam-src-gastat-uptime"],"origin":"global","reviewedAt":"2026-09-28"},"connections":[{"id":"fam-gastat-riyadh-data-center-location","sourceId":"gastat-riyadh-data-center","targetId":"country-sa","label":"Located in Saudi Arabia","description":"A physical location relationship; it does not assign ownership or financing to the national government.","kind":"located_in","status":"documented","sourceIds":["fam-src-gastat-alfanar","fam-src-gastat-uptime"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-gastat-client","sourceId":"gastat","targetId":"gastat-riyadh-data-center","label":"Project client","description":"Named civilian statistics-agency client; no separate operator is identified.","kind":"project_client","status":"documented","sourceIds":["fam-src-gastat-alfanar"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-alfanar-gastat","sourceId":"alfanar-projects","targetId":"gastat-riyadh-data-center","label":"Civil, cabling and electromechanical works","description":"Contractor states the project is completed; completion date is not provided.","kind":"mep_contractor","status":"documented","sourceIds":["fam-src-gastat-alfanar"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"proposal-facility-levy-gastat-riyadh-data-center","sourceId":"gastat-riyadh-data-center","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[],"sources":[{"id":"fam-src-s3-multiplex","title":"Multiplex completes Stage Two of NEXTDC S3 Sydney","url":"https://www.multiplex.global/news/multiplex-completes-stage-two-of-nextdc-s-s3-sydney-data-centre-strengthening-sydney-s-next-gen-digital-footprint/","publisher":"Multiplex","publishedAt":"2023-06-14","accessedAt":"2026-09-28","kind":"primary","note":"Contractor completion statement: Stage Two; Stage One was already occupied during these works."},{"id":"fam-src-elmina-gamuda","title":"Gamuda secures contracts for Elmina Business Park hyperscale data centre","url":"https://gamuda.com/2024/05/gamuda-secures-rm1-74-billion-contract-for-hyperscale-data-centre-in-elmina-business-park/press-releases/","publisher":"Gamuda Berhad","publishedAt":"2024-05-24","accessedAt":"2026-09-28","kind":"primary","note":"Separate construction and MEP awards. Original target dates are not evidence of actual completion or payments."},{"id":"fam-src-sg5-equinix","title":"Equinix expands its fifth Singapore data center, SG5","url":"https://newsroom.equinix.com/2022-04-21-Equinix-Supports-Singapores-Green-Plan-and-Regional-Digital-Hub-Ambitions-by-Expanding-Its-Fifth-Data-Center","publisher":"Equinix","publishedAt":"2022-04-21","accessedAt":"2026-09-28","kind":"primary","note":"SG5 is a specific nine-storey facility in Tanjong Kling. Expansion announcement is not a disbursement account."},{"id":"fam-src-nm1-yotta","title":"Inside Yotta NM1","url":"https://colocation.yotta.com/blog/inside-yotta-nm1-asias-largest-tier-iv-data-center/","publisher":"Yotta","publishedAt":"2024-11-27","accessedAt":"2026-09-28","kind":"primary","note":"Operator account of the named Navi Mumbai building, on-site management and Shakti Cloud. Marketing performance/sustainability claims are not adopted as independent measurements."},{"id":"fam-src-auh6-launch","title":"Khazna launches AUH6 in Masdar City","url":"https://khaznadatacenters.com/press-release/khazna-data-centers-fuels-uaes-digital-future-with-the-launch-of-hyperscale-ai-ready-data-center-in-masdar-city/","publisher":"Khazna Data Centers","publishedAt":"2024-02-06","accessedAt":"2026-09-28","kind":"primary","note":"Operator launch identifies location, AI-related hosting and 31.8MW IT capacity; no individual hyperscaler tenant is named."},{"id":"fam-src-gastat-alfanar","title":"GASTAT Data Center Project","url":"https://alfanarprojects.com/en-us/projects/gastat-data-center-project/","publisher":"Alfanar Projects","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Contractor labels the project completed and gives civil/electromechanical/cabling scope; completion date and current O&M provider are not disclosed."},{"id":"fam-src-gastat-uptime","title":"GaStat Data Center — facility award register","url":"https://uptimeinstitute.com/uptime-institute-awards/datacenter/gastat-data-center/889","publisher":"Uptime Institute","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Facility entry identifies Riyadh, Saudi Arabia; location corroboration only, not a military or AI-use claim."},{"id":"fam-src-rotem-electra","title":"Data Center Rotem — Bank Hapoalim","url":"https://www.electra.co.il/en/electra_building/projects/data_center_rotem_-_bank_hapoalim","publisher":"Electra Group","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Separately names construction, M&E, backup-generator and elevator roles. Current maintenance assignments are not given."}],"neighbors":[{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"country-sa","slug":"country-sa","name":"Saudi Arabia","kind":"country"},{"id":"alfanar-projects","slug":"alfanar-projects","name":"Alfanar Projects","kind":"company"},{"id":"gastat","slug":"gastat","name":"General Authority for Statistics","kind":"public_institution"},{"id":"gastat-riyadh-data-center","slug":"gastat-riyadh-data-center","name":"GASTAT Riyadh data center","kind":"facility"}],"gaps":[{"id":"fam-gap-site-coverage","title":"Nine disclosed sites are a starting point","description":"This layer covers selected buildings and campuses in seven jurisdictions. It is not a census of regional facilities or evidence that every site hosts AI or military workloads.","entityIds":["nextdc-s3-sydney","elmina-business-park-1a","equinix-sg5","yotta-nm1","khazna-auh6","gastat-riyadh-data-center","rotem-bank-hapoalim"],"sourceIds":["fam-src-s3-multiplex","fam-src-elmina-gamuda","fam-src-sg5-equinix","fam-src-nm1-yotta","fam-src-auh6-launch","fam-src-gastat-alfanar","fam-src-rotem-electra"],"nextStep":"Add facility-level permits, utility records, disclosed subcontractors and dated handovers. Keep operating sites, contracted phases and proposed expansions distinct."}],"snapshotDate":"2026-09-28"}