SVG-Rennesøy

Green Mountain facility near Stavanger.

The operator’s portfolio and a 2015 Schneider account identify the same Rennesøy site. Historical equipment installation is separate from ongoing maintenance.

Follow a relationship.

Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.

documented

Listed operator

Green Mountain → SVG-Rennesøy

The operator’s portfolio identifies SVG-Rennesøy near Stavanger.

Date not isolated · facility operator

documented

Cooling-system design

Schneider Electric → SVG-Rennesøy

Historical supplier account says Schneider assisted design of the cooling system.

2015-10-01 · mechanical design

documented

Infrastructure installation

Schneider Electric → SVG-Rennesøy

The 2015 account documents power, cooling and monitoring equipment/software installation. It does not identify an ongoing maintenance contract.

2015-10-01 · equipment supply installation

documented

Located in

SVG-Rennesøy → Norway

Geographic context; this edge does not imply government ownership or funding.

Date not isolated · location

proposal

Proposed data-center levy scope

SVG-Rennesøy → AI companies & data-center operators

This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.

Date not isolated · proposed levy coverage

What remains unresolved.

Different stages, different responsibilities

A named builder, installer or equipment supplier is not automatically a maintenance provider. FRA7 remains a construction-stage record; announcements do not establish completed commissioning.

Next research step: Add completion certificates and separately sourced operating appointments as they become public.

Sources in this record.

  1. SVG-Rennesøy data centerGreen Mountain · Publication date not isolated · source access 2026-09-28

    Current operator portfolio listing accessed on the review date.

  2. Green Mountain creates data-center harmony with natureSchneider Electric · 2015-10-01 · source access 2026-09-28

    Historical supplier account identifies Rennesøy, cooling design and installed infrastructure. Marketing claims of zero emissions are not adopted; no maintenance contract is established.

  3. SPIE builds AI-enabled data centre for firstcolo in Rosbach vor der HöheSPIE · 2026-06-30 · source access 2026-09-28

    Construction announcement: ground-breaking June 2026; phased completion forecast by end-2028. Named scopes are assignments, not proof of completed work.

  4. NorthC Datacenter, GroningenFireX · Publication date not isolated · source access 2026-09-28

    Explicit scope split: FireX designed, supplied and commissioned; Hamer installed. Generic maintenance offerings on the page are not a site maintenance appointment.