Europe / facility / reviewed 2026-09-28
SVG-Rennesøy
Green Mountain facility near Stavanger.
The operator’s portfolio and a 2015 Schneider account identify the same Rennesøy site. Historical equipment installation is separate from ongoing maintenance.
Follow a relationship.
Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.
Listed operator
The operator’s portfolio identifies SVG-Rennesøy near Stavanger.
Date not isolated · facility operator
Cooling-system design
Schneider Electric → SVG-Rennesøy
Historical supplier account says Schneider assisted design of the cooling system.
2015-10-01 · mechanical design
Infrastructure installation
Schneider Electric → SVG-Rennesøy
The 2015 account documents power, cooling and monitoring equipment/software installation. It does not identify an ongoing maintenance contract.
2015-10-01 · equipment supply installation
Located in
Geographic context; this edge does not imply government ownership or funding.
Date not isolated · location
Proposed data-center levy scope
SVG-Rennesøy → AI companies & data-center operators
This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.
Date not isolated · proposed levy coverage
What remains unresolved.
Different stages, different responsibilities
A named builder, installer or equipment supplier is not automatically a maintenance provider. FRA7 remains a construction-stage record; announcements do not establish completed commissioning.
Next research step: Add completion certificates and separately sourced operating appointments as they become public.
Sources in this record.
- SVG-Rennesøy data centerGreen Mountain · Publication date not isolated · source access 2026-09-28
Current operator portfolio listing accessed on the review date.
- Green Mountain creates data-center harmony with natureSchneider Electric · 2015-10-01 · source access 2026-09-28
Historical supplier account identifies Rennesøy, cooling design and installed infrastructure. Marketing claims of zero emissions are not adopted; no maintenance contract is established.
- SPIE builds AI-enabled data centre for firstcolo in Rosbach vor der HöheSPIE · 2026-06-30 · source access 2026-09-28
Construction announcement: ground-breaking June 2026; phased completion forecast by end-2028. Named scopes are assignments, not proof of completed work.
- NorthC Datacenter, GroningenFireX · Publication date not isolated · source access 2026-09-28
Explicit scope split: FireX designed, supplied and commissioned; Hamer installed. Generic maintenance offerings on the page are not a site maintenance appointment.