{"entity":{"id":"facility-svg-rennesoy","slug":"facility-svg-rennesoy","name":"SVG-Rennesøy","kind":"facility","countryCodes":["NO"],"summary":"Green Mountain facility near Stavanger.","description":"The operator’s portfolio and a 2015 Schneider account identify the same Rennesøy site. Historical equipment installation is separate from ongoing maintenance.","sourceIds":["fe-src-svg-owner","fe-src-svg-schneider"],"region":"Europe","theme":"infrastructure","origin":"global","reviewedAt":"2026-09-28"},"connections":[{"id":"fe-green-mountain-svg","sourceId":"green-mountain","targetId":"facility-svg-rennesoy","label":"Listed operator","description":"The operator’s portfolio identifies SVG-Rennesøy near Stavanger.","kind":"facility_operator","status":"documented","sourceIds":["fe-src-svg-owner"],"date":null,"recordIds":[],"theme":"infrastructure"},{"id":"fe-schneider-svg-design","sourceId":"schneider-electric","targetId":"facility-svg-rennesoy","label":"Cooling-system design","description":"Historical supplier account says Schneider assisted design of the cooling system.","kind":"mechanical_design","status":"documented","sourceIds":["fe-src-svg-schneider"],"date":"2015-10-01","recordIds":[],"theme":"infrastructure"},{"id":"fe-schneider-svg-install","sourceId":"schneider-electric","targetId":"facility-svg-rennesoy","label":"Infrastructure installation","description":"The 2015 account documents power, cooling and monitoring equipment/software installation. It does not identify an ongoing maintenance contract.","kind":"equipment_supply_installation","status":"documented","sourceIds":["fe-src-svg-schneider"],"date":"2015-10-01","recordIds":[],"theme":"infrastructure"},{"id":"fe-facility-svg-rennesoy-location","sourceId":"facility-svg-rennesoy","targetId":"country-no","label":"Located in","description":"Geographic context; this edge does not imply government ownership or funding.","kind":"location","status":"documented","sourceIds":["fe-src-svg-schneider"],"date":null,"recordIds":[],"theme":"infrastructure"},{"id":"proposal-facility-levy-facility-svg-rennesoy","sourceId":"facility-svg-rennesoy","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[],"sources":[{"id":"fe-src-svg-owner","title":"SVG-Rennesøy data center","url":"https://greenmountain.no/data-center/svg-rennesoy/","publisher":"Green Mountain","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Current operator portfolio listing accessed on the review date."},{"id":"fe-src-svg-schneider","title":"Green Mountain creates data-center harmony with nature","url":"https://blog.se.com/datacenter/2015/10/01/green-mountain-creates-data-center-harmony-with-nature/","publisher":"Schneider Electric","publishedAt":"2015-10-01","accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Historical supplier account identifies Rennesøy, cooling design and installed infrastructure. Marketing claims of zero emissions are not adopted; no maintenance contract is established."},{"id":"fe-src-fra7-spie","title":"SPIE builds AI-enabled data centre for firstcolo in Rosbach vor der Höhe","url":"https://www.spie.com/en/news/spie-builds-ai-enabled-data-centre-firstcolo-rosbach-vor-der-hohe-germany","publisher":"SPIE","publishedAt":"2026-06-30","accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Construction announcement: ground-breaking June 2026; phased completion forecast by end-2028. Named scopes are assignments, not proof of completed work."},{"id":"fe-src-northc-firex","title":"NorthC Datacenter, Groningen","url":"https://www.firex.nl/en/projecten/northc-datacenter-groningen/","publisher":"FireX","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Explicit scope split: FireX designed, supplied and commissioned; Hamer installed. Generic maintenance offerings on the page are not a site maintenance appointment."}],"neighbors":[{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"country-no","slug":"country-no","name":"Norway","kind":"country"},{"id":"green-mountain","slug":"green-mountain","name":"Green Mountain","kind":"company"},{"id":"schneider-electric","slug":"schneider-electric","name":"Schneider Electric","kind":"company"},{"id":"facility-svg-rennesoy","slug":"facility-svg-rennesoy","name":"SVG-Rennesøy","kind":"facility"}],"gaps":[{"id":"fe-gap-lifecycle","title":"Different stages, different responsibilities","description":"A named builder, installer or equipment supplier is not automatically a maintenance provider. FRA7 remains a construction-stage record; announcements do not establish completed commissioning.","entityIds":["facility-firstcolo-fra7","facility-svg-rennesoy","facility-northc-groningen"],"sourceIds":["fe-src-fra7-spie","fe-src-svg-schneider","fe-src-northc-firex"],"nextStep":"Add completion certificates and separately sourced operating appointments as they become public."}],"snapshotDate":"2026-09-28"}