Rotem / Bank Hapoalim data center
Emek Hefer banking facility with separate Electra construction and services roles.
Contractor records give a 2013–2015 project period. Construction and equipment scopes are documented; present operation, maintenance contracts and any cloud or military tenant are not established.
Follow a relationship.
Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.
Located in Israel
Rotem / Bank Hapoalim data center → Israel
A physical location relationship; it does not assign ownership or financing to the national government.
Date not isolated · located in
Project client
Bank Hapoalim → Rotem / Bank Hapoalim data center
Civilian banking facility; source does not identify military or hyperscaler use.
Date not isolated · project client
Building construction
Electra Construction → Rotem / Bank Hapoalim data center
Construction role is separately identified in Electra’s project record.
2013–2015 · construction
Electromechanical supply and installation
Electra M&E → Rotem / Bank Hapoalim data center
Includes data-center cooling systems; not an O&M contract.
Date not isolated · mep contractor
Backup generators
Electra FK → Rotem / Bank Hapoalim data center
Supplied the backup generator systems. No generator runtime or emissions measurement is disclosed.
Date not isolated · equipment supply
Elevator supply and installation
Electra Elevators → Rotem / Bank Hapoalim data center
A distinct building-services role in the project record.
Date not isolated · equipment supply
Proposed data-center levy scope
Rotem / Bank Hapoalim data center → AI companies & data-center operators
This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.
Date not isolated · proposed levy coverage
What remains unresolved.
Nine disclosed sites are a starting point
This layer covers selected buildings and campuses in seven jurisdictions. It is not a census of regional facilities or evidence that every site hosts AI or military workloads.
Next research step: Add facility-level permits, utility records, disclosed subcontractors and dated handovers. Keep operating sites, contracted phases and proposed expansions distinct.
Sources in this record.
- Multiplex completes Stage Two of NEXTDC S3 SydneyMultiplex · 2023-06-14 · source access 2026-09-28
Contractor completion statement: Stage Two; Stage One was already occupied during these works.
- Gamuda secures contracts for Elmina Business Park hyperscale data centreGamuda Berhad · 2024-05-24 · source access 2026-09-28
Separate construction and MEP awards. Original target dates are not evidence of actual completion or payments.
- Equinix expands its fifth Singapore data center, SG5Equinix · 2022-04-21 · source access 2026-09-28
SG5 is a specific nine-storey facility in Tanjong Kling. Expansion announcement is not a disbursement account.
- Inside Yotta NM1Yotta · 2024-11-27 · source access 2026-09-28
Operator account of the named Navi Mumbai building, on-site management and Shakti Cloud. Marketing performance/sustainability claims are not adopted as independent measurements.
- Khazna launches AUH6 in Masdar CityKhazna Data Centers · 2024-02-06 · source access 2026-09-28
Operator launch identifies location, AI-related hosting and 31.8MW IT capacity; no individual hyperscaler tenant is named.
- GASTAT Data Center ProjectAlfanar Projects · Publication date not isolated · source access 2026-09-28
Contractor labels the project completed and gives civil/electromechanical/cabling scope; completion date and current O&M provider are not disclosed.
- Data Center Rotem — Bank HapoalimElectra Group · Publication date not isolated · source access 2026-09-28
Separately names construction, M&E, backup-generator and elevator roles. Current maintenance assignments are not given.
- Rotem, Emek Hefer — project recordElectra Group · Publication date not isolated · source access 2026-09-28
Period appears as “2015 - 2013”; represented here as 2013–2015. The $17m budget is omitted from numeric ledgers because the page does not identify the dollar currency.