Middle East / facility / reviewed 2026-09-28

Khazna DXB2 / D3

Dubai Design District project with a disclosed structural-steel subcontract.

Groundbreaking: October 2022. A June 2023 contractor letter documents the steel package. An exact operational launch date was not verified; DXB2 is distinct from DXB3 and Equinix DX2.

Follow a relationship.

Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.

documented

Located in the UAE

Khazna DXB2 / D3 → United Arab Emirates

A physical location relationship; it does not assign ownership or financing to the national government.

Date not isolated · located in

documented

Develops DXB2

Khazna Data Centers → Khazna DXB2 / D3

2022 announcement identifies the Dubai Design District building; opening was then a forecast.

2022-10-11 · facility development

documented

Construction contractor

Laing O’Rourke Middle East → Khazna DXB2 / D3

Named by Assent; the signed letter identifies DXB2 (D3).

Date not isolated · construction

documented

Structural-steel supply and installation

Assent Steel → Khazna DXB2 / D3

Steel package identified by project page and June 2023 contractor appreciation letter.

2023-06-09 · structural steel

documented

Project consultant

GHD → Khazna DXB2 / D3

Consultant named in the steel supplier’s project record.

Date not isolated · design consultant

proposal

Proposed data-center levy scope

Khazna DXB2 / D3 → AI companies & data-center operators

This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.

Date not isolated · proposed levy coverage

What remains unresolved.

Target dates are not verified operating dates

Elmina’s original schedules and DXB2’s planned opening are preserved as forecasts. A steel-package completion letter is narrower than whole-building commissioning.

Next research step: Add operator opening notices, commissioning certificates and phase-specific handover records. Retain earlier forecasts alongside actual dates.

Sources in this record.

  1. Gamuda secures contracts for Elmina Business Park hyperscale data centreGamuda Berhad · 2024-05-24 · source access 2026-09-28

    Separate construction and MEP awards. Original target dates are not evidence of actual completion or payments.

  2. Sime Darby Property widens industrial footprint with Elmina Business Park 2Sime Darby Property · 2026-04-13 · source access 2026-09-28

    References the first Google data centre in the original Elmina Business Park, then scheduled for Q2 2026. Do not confuse it with the new Business Park 2.

  3. Khazna begins construction of DXB2 and DXB3Khazna Data Centers · 2022-10-11 · source access 2026-09-28

    DXB2 is in Dubai Design District. The 43MW figure is combined DXB2/DXB3 capacity and is not assigned to DXB2 alone.

  4. Khazna Data Centre Dubai — structural steel packageAssent Steel · Publication date not isolated · source access 2026-09-28

    Names Laing O’Rourke Middle East and GHD; supplier scope is structural-steel supply and installation, with start year 2022.

  5. Assent prequalification document — DXB2 (D3) contractor letterAssent Steel / Laing O’Rourke Middle East · Publication date not isolated · source access 2026-09-28

    PDF page 81: contractor letter dated 9 June 2023 identifies Khazna Project DXB2 (D3), Dubai, and Assent’s completed steel subcontract. Publication date of the compilation is not stated.