← Locate in the interconnected atlas

Europe / company / reviewed 2026-09-28

Hamer

Groningen fire-system installer.

FireX names Hamer as the main contractor for the third-hall project.

Follow a relationship.

Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.

documented

Main contractor and installer

Hamer → NorthC Groningen campus

Hamer installed the water-mist system in the third-hall project described by FireX.

Date not isolated · fire protection contractor

documented

Project supply relationship

FireX → Hamer

The Groningen case names Hamer as recipient of FireX’s designed and supplied system.

Date not isolated · subcontract supply

Sources in this record.

  1. NorthC Datacenter, GroningenFireX · Publication date not isolated · source access 2026-09-28

    Explicit scope split: FireX designed, supplied and commissioned; Hamer installed. Generic maintenance offerings on the page are not a site maintenance appointment.