Europe / facility / reviewed 2026-09-28
FRA7 · Rosbach
Under construction in June 2026.
SPIE forecast phased completion by end-2028.
Follow a relationship.
Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.
Development client
Construction-stage assignment.
2026-06-30 · developer operator
Technical delivery coordination
Group-coordinated building-services scope.
2026-06-30 · mep contractor
Commissioning and critical systems
SPIE Data Center → FRA7 · Rosbach
Assigned project management, backup power, UPS, fire suppression and automation.
2026-06-30 · commissioning contractor
Electrical installations
Assigned electrical works.
2026-06-30 · electrical contractor
Mechanical installations
Assigned heating, ventilation, sanitation and cooling.
2026-06-30 · mechanical contractor
Power installations
Assigned medium-voltage systems and transformers.
2026-06-30 · electrical contractor
Low-voltage and IT systems
Assigned low-voltage, access-control and IT scope.
2026-06-30 · systems contractor
Building works
Assigned structure, façade and interior outfitting.
2026-06-30 · general contractor
Located in
Geographic context; this edge does not imply government ownership or funding.
Date not isolated · location
Proposed data-center levy scope
FRA7 · Rosbach → AI companies & data-center operators
This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.
Date not isolated · proposed levy coverage
What remains unresolved.
Different stages, different responsibilities
A named builder, installer or equipment supplier is not automatically a maintenance provider. FRA7 remains a construction-stage record; announcements do not establish completed commissioning.
Next research step: Add completion certificates and separately sourced operating appointments as they become public.
Sources in this record.
- Green Mountain creates data-center harmony with natureSchneider Electric · 2015-10-01 · source access 2026-09-28
Historical supplier account identifies Rennesøy, cooling design and installed infrastructure. Marketing claims of zero emissions are not adopted; no maintenance contract is established.
- SPIE builds AI-enabled data centre for firstcolo in Rosbach vor der HöheSPIE · 2026-06-30 · source access 2026-09-28
Construction announcement: ground-breaking June 2026; phased completion forecast by end-2028. Named scopes are assignments, not proof of completed work.
- NorthC Datacenter, GroningenFireX · Publication date not isolated · source access 2026-09-28
Explicit scope split: FireX designed, supplied and commissioned; Hamer installed. Generic maintenance offerings on the page are not a site maintenance appointment.