Europe / facility / reviewed 2026-09-28

FRA7 · Rosbach

Under construction in June 2026.

SPIE forecast phased completion by end-2028.

Follow a relationship.

Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.

documented

Development client

firstcolo → FRA7 · Rosbach

Construction-stage assignment.

2026-06-30 · developer operator

documented

Technical delivery coordination

SPIE → FRA7 · Rosbach

Group-coordinated building-services scope.

2026-06-30 · mep contractor

documented

Commissioning and critical systems

SPIE Data Center → FRA7 · Rosbach

Assigned project management, backup power, UPS, fire suppression and automation.

2026-06-30 · commissioning contractor

documented

Electrical installations

SPIE Lück → FRA7 · Rosbach

Assigned electrical works.

2026-06-30 · electrical contractor

documented

Mechanical installations

SPIE Wiegel → FRA7 · Rosbach

Assigned heating, ventilation, sanitation and cooling.

2026-06-30 · mechanical contractor

documented

Power installations

SPIE SNG → FRA7 · Rosbach

Assigned medium-voltage systems and transformers.

2026-06-30 · electrical contractor

documented

Low-voltage and IT systems

SPIE ICS → FRA7 · Rosbach

Assigned low-voltage, access-control and IT scope.

2026-06-30 · systems contractor

documented

Building works

Lupp → FRA7 · Rosbach

Assigned structure, façade and interior outfitting.

2026-06-30 · general contractor

documented

Located in

FRA7 · Rosbach → Germany

Geographic context; this edge does not imply government ownership or funding.

Date not isolated · location

proposal

Proposed data-center levy scope

FRA7 · Rosbach → AI companies & data-center operators

This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.

Date not isolated · proposed levy coverage

What remains unresolved.

Different stages, different responsibilities

A named builder, installer or equipment supplier is not automatically a maintenance provider. FRA7 remains a construction-stage record; announcements do not establish completed commissioning.

Next research step: Add completion certificates and separately sourced operating appointments as they become public.

Sources in this record.

  1. Green Mountain creates data-center harmony with natureSchneider Electric · 2015-10-01 · source access 2026-09-28

    Historical supplier account identifies Rennesøy, cooling design and installed infrastructure. Marketing claims of zero emissions are not adopted; no maintenance contract is established.

  2. SPIE builds AI-enabled data centre for firstcolo in Rosbach vor der HöheSPIE · 2026-06-30 · source access 2026-09-28

    Construction announcement: ground-breaking June 2026; phased completion forecast by end-2028. Named scopes are assignments, not proof of completed work.

  3. NorthC Datacenter, GroningenFireX · Publication date not isolated · source access 2026-09-28

    Explicit scope split: FireX designed, supplied and commissioned; Hamer installed. Generic maintenance offerings on the page are not a site maintenance appointment.