North America / facility / reviewed 2026-09-28

Digital Realty · Toronto Star conversion

Historical facility case with an unresolved municipal label.

Plan Group dates its electrical and technology work to 2018 and labels the former printing-plant project Markham, Ontario. The possible correspondence with TOR1 in Vaughan is not asserted as a documented identity.

Follow a relationship.

Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.

documented

Operator named in historical case

Digital Realty → Digital Realty · Toronto Star conversion

The contractor names Digital Realty. Exact correspondence with the current operator catalogue remains unresolved.

Date not isolated · facility client

documented

Electrical and technology installation

Plan Group → Digital Realty · Toronto Star conversion

Work completed in 2018 includes high-voltage/distribution systems, UPS, fire alarm, security and IT infrastructure.

Date not isolated · electrical construction

documented

Jointly named construction client

EllisDon → Digital Realty · Toronto Star conversion

Plan Group lists EllisDon/Hitt jointly as its client. The source does not allocate each company’s individual scope.

Date not isolated · project client

documented

Jointly named construction client

HITT Contracting → Digital Realty · Toronto Star conversion

Plan Group lists EllisDon/Hitt jointly as its client. The source does not allocate each company’s individual scope.

Date not isolated · project client

documented

Physical project location

Digital Realty · Toronto Star conversion → Canada

Geographic relationship only; it does not establish government funding, military use or a political alliance.

Date not isolated · located in

proposal

Proposed data-center levy scope

Digital Realty · Toronto Star conversion → AI companies & data-center operators

This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.

Date not isolated · proposed levy coverage

What remains unresolved.

Resolve the Ontario conversion’s conflicting municipal label

Plan Group labels its Toronto Star conversion Markham. EllisDon describes TOR1 as a newspaper conversion, while Digital Realty places TOR1 in Vaughan. The selected historical project remains a separate case identifier until that mismatch is resolved.

Next research step: Obtain the original project address, permit or contractor clarification before merging with a current TOR1 facility record. Country-level location is retained; no exact address is assigned.

Sources in this record.

  1. Digital Realty Data Centre: Toronto Star conversionPlan Group · Publication date not isolated · source access 2026-09-28

    Historical electrical and technology scope, completed 2018; names EllisDon/Hitt as client. The page labels the location Markham; this conflicts with a possible TOR1 identification and is retained as an unresolved location/identifier gap.

  2. Digital Realty TOR1: newspaper-plant conversionEllisDon · Publication date not isolated · source access 2026-09-28

    Comparison evidence for the unresolved project-identity gap. It names TOR1 and a former newspaper facility, but is not used to assert that Plan Group's differently located record is definitively the same site.

  3. TOR1 Data Center: 1 Century Place, VaughanDigital Realty · Publication date not isolated · source access 2026-09-28

    Current operator directory identifies TOR1 in Vaughan. A current site listing does not resolve the conflicting Markham label in the selected contractor case.