Colovore

Colocation operator named in Therma’s Santa Clara engineering case.

The cited case concerns one Santa Clara project. It does not establish Therma’s role at every Colovore facility or a continuing service contract.

Follow a relationship.

Direction records the stated relationship. A path through this web does not establish intent, causation or control beyond its individual records.

documented

Named colocation customer

Colovore → Colovore · Santa Clara engineering case

Legence identifies Colovore as the Santa Clara data-center customer in the historical engineering case.

Date not isolated · facility client

proposal

Proposed operator levy scope

Colovore → AI companies & data-center operators

This operator’s AI/cloud or data-center activities belong to the proposed sector-wide assessment. This is a policy proposal; legal boundaries, tax base, rate and jurisdiction remain to be determined. No existing payment or liability is asserted.

Date not isolated · proposed levy coverage

What remains unresolved.

Resolve the Colovore case date and current site identity

Legence labels the case completed in 2021, while a 2014 report documents Therma’s participation. The selected sources do not reconcile those dates or identify which current Colovore site code covers the case.

Next research step: Obtain the original project record and facility address before assigning a completion year or current site code.

Sources in this record.

  1. Colovore Data Center case studyLegence · Publication date not isolated · source access 2026-10-01

    Attributes engineering and design of a Santa Clara Colovore facility to Therma. The page says completed 2021, while contemporary 2014 coverage already describes Therma project work; the date conflict is not resolved here. Performance and emissions figures are self-reported and excluded.

  2. Colovore Brings Liquid-Cooled Colo to Silicon ValleyData Center Knowledge · 2014-06-11 · source access 2026-10-01

    Quotes a Therma mechanical engineer about the Santa Clara cooling system; corroborates a historical project role, not ongoing maintenance.