{"entity":{"id":"nextdc-s3-sydney","slug":"nextdc-s3-sydney","name":"NEXTDC S3 Sydney","kind":"facility","summary":"Artarmon building with documented construction, electrical, lighting and historical O&M roles.","description":"Multiplex reported Stage Two completion on 14 June 2023. The cited lighting package was completed in 2022. The 2024 O&M certificate is historical and expired in May 2025.","countryCodes":["AU"],"region":"Asia-Pacific","theme":"infrastructure","sourceIds":["fam-src-s3-multiplex","fam-src-s3-ozuno","fam-src-s3-om-scope"],"origin":"global","reviewedAt":"2026-09-28"},"connections":[{"id":"fam-nextdc-s3-sydney-location","sourceId":"nextdc-s3-sydney","targetId":"country-au","label":"Located in Australia","description":"A physical location relationship; it does not assign ownership or financing to the national government.","kind":"located_in","status":"documented","sourceIds":["fam-src-s3-multiplex"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-nextdc-s3-om","sourceId":"nextdc","targetId":"nextdc-s3-sydney","label":"Operations and maintenance — 2024 scope","description":"The certificate expressly includes S3. Its May 2025 expiry is retained; this edge does not claim renewed certification.","kind":"operations_maintenance","status":"documented","sourceIds":["fam-src-s3-om-scope"],"recordIds":[],"date":"2024-05-31","theme":"infrastructure"},{"id":"fam-multiplex-s3","sourceId":"multiplex","targetId":"nextdc-s3-sydney","label":"Stage Two construction","description":"Multiplex reported completion on 14 June 2023.","kind":"construction","status":"documented","sourceIds":["fam-src-s3-multiplex"],"recordIds":[],"date":"2023-06-14","theme":"infrastructure"},{"id":"fam-heyday-s3","sourceId":"heyday","targetId":"nextdc-s3-sydney","label":"Electrical contractor","description":"Ozuno’s project record identifies Heyday 5 for the 2022 lighting package.","kind":"electrical_contractor","status":"documented","sourceIds":["fam-src-s3-ozuno"],"recordIds":[],"date":"2022","theme":"infrastructure"},{"id":"fam-mysmart-s3","sourceId":"mysmart","targetId":"nextdc-s3-sydney","label":"Lighting systems integration","description":"Named integrator for the RAPIX lighting project.","kind":"systems_integration","status":"documented","sourceIds":["fam-src-s3-ozuno"],"recordIds":[],"date":"2022","theme":"infrastructure"},{"id":"fam-ozuno-s3","sourceId":"ozuno","targetId":"nextdc-s3-sydney","label":"RAPIX lighting controls","description":"Vendor case documents controllers, sensors and switch inputs for general and emergency lighting.","kind":"equipment_supply","status":"documented","sourceIds":["fam-src-s3-ozuno"],"recordIds":[],"date":"2022","theme":"infrastructure"},{"id":"proposal-facility-levy-nextdc-s3-sydney","sourceId":"nextdc-s3-sydney","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[],"sources":[{"id":"fam-src-s3-multiplex","title":"Multiplex completes Stage Two of NEXTDC S3 Sydney","url":"https://www.multiplex.global/news/multiplex-completes-stage-two-of-nextdc-s-s3-sydney-data-centre-strengthening-sydney-s-next-gen-digital-footprint/","publisher":"Multiplex","publishedAt":"2023-06-14","accessedAt":"2026-09-28","kind":"primary","note":"Contractor completion statement: Stage Two; Stage One was already occupied during these works."},{"id":"fam-src-s3-ozuno","title":"NEXTDC S3 Artarmon Sydney — project snapshot","url":"https://ozuno.com/blog/nextdc-artarmon-project-snapshot/","publisher":"Ozuno","publishedAt":"2023-04-28","accessedAt":"2026-09-28","kind":"primary","note":"Names builder, electrical contractor and systems integrator. Lighting package marked completed in 2022; no maintenance term disclosed."},{"id":"fam-src-s3-om-scope","title":"NEXTDC ISO/IEC 27001 certificate ITGOV40020 — historical O&M scope","url":"https://nextdc.com/hubfs/ISO_27001_Certification_Final.pdf","publisher":"Intertek SAI Global / NEXTDC","publishedAt":"2024-05-31","accessedAt":"2026-09-28","kind":"primary","note":"Pages 1 and 6 explicitly include operations and maintenance at S3 Artarmon. This copy expired 16 May 2025; it is historical role evidence, not proof of current certification."},{"id":"fam-src-elmina-gamuda","title":"Gamuda secures contracts for Elmina Business Park hyperscale data centre","url":"https://gamuda.com/2024/05/gamuda-secures-rm1-74-billion-contract-for-hyperscale-data-centre-in-elmina-business-park/press-releases/","publisher":"Gamuda Berhad","publishedAt":"2024-05-24","accessedAt":"2026-09-28","kind":"primary","note":"Separate construction and MEP awards. Original target dates are not evidence of actual completion or payments."},{"id":"fam-src-sg5-equinix","title":"Equinix expands its fifth Singapore data center, SG5","url":"https://newsroom.equinix.com/2022-04-21-Equinix-Supports-Singapores-Green-Plan-and-Regional-Digital-Hub-Ambitions-by-Expanding-Its-Fifth-Data-Center","publisher":"Equinix","publishedAt":"2022-04-21","accessedAt":"2026-09-28","kind":"primary","note":"SG5 is a specific nine-storey facility in Tanjong Kling. Expansion announcement is not a disbursement account."},{"id":"fam-src-nm1-yotta","title":"Inside Yotta NM1","url":"https://colocation.yotta.com/blog/inside-yotta-nm1-asias-largest-tier-iv-data-center/","publisher":"Yotta","publishedAt":"2024-11-27","accessedAt":"2026-09-28","kind":"primary","note":"Operator account of the named Navi Mumbai building, on-site management and Shakti Cloud. Marketing performance/sustainability claims are not adopted as independent measurements."},{"id":"fam-src-auh6-launch","title":"Khazna launches AUH6 in Masdar City","url":"https://khaznadatacenters.com/press-release/khazna-data-centers-fuels-uaes-digital-future-with-the-launch-of-hyperscale-ai-ready-data-center-in-masdar-city/","publisher":"Khazna Data Centers","publishedAt":"2024-02-06","accessedAt":"2026-09-28","kind":"primary","note":"Operator launch identifies location, AI-related hosting and 31.8MW IT capacity; no individual hyperscaler tenant is named."},{"id":"fam-src-auh6-emerge","title":"Emerge agreement for Khazna AUH6 solar plant","url":"https://masdar.ae/en/news/newsroom/emerge-signs-agreement-to-develop-solar-plant","publisher":"Masdar","publishedAt":"2022-10-18","accessedAt":"2026-09-28","kind":"primary","note":"Emerge agreement covers financing, design, procurement, construction and 25-year O&M of the 7MWp solar plant serving AUH6, not all data-center equipment."},{"id":"fam-src-khazna-nexops","title":"Khazna announces its in-house NexOps organization","url":"https://khaznadatacenters.com/press-release/khazna-sets-a-new-standard-for-mission-critical-data-center-operations-with-launch-of-khazna-nexops/","publisher":"Khazna Data Centers","publishedAt":"2026-02-09","accessedAt":"2026-09-28","kind":"primary","note":"Portfolio-level operating organization, reported as supporting over 30 centers. Site assignments and individual maintenance agreements are not disclosed here."},{"id":"fam-src-gastat-alfanar","title":"GASTAT Data Center Project","url":"https://alfanarprojects.com/en-us/projects/gastat-data-center-project/","publisher":"Alfanar Projects","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Contractor labels the project completed and gives civil/electromechanical/cabling scope; completion date and current O&M provider are not disclosed."},{"id":"fam-src-rotem-electra","title":"Data Center Rotem — Bank Hapoalim","url":"https://www.electra.co.il/en/electra_building/projects/data_center_rotem_-_bank_hapoalim","publisher":"Electra Group","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Separately names construction, M&E, backup-generator and elevator roles. Current maintenance assignments are not given."}],"neighbors":[{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"country-au","slug":"country-au","name":"Australia","kind":"country"},{"id":"nextdc","slug":"nextdc","name":"NEXTDC","kind":"company"},{"id":"multiplex","slug":"multiplex","name":"Multiplex","kind":"company"},{"id":"heyday","slug":"heyday","name":"Heyday","kind":"company"},{"id":"mysmart","slug":"mysmart","name":"mySmart","kind":"company"},{"id":"ozuno","slug":"ozuno","name":"Ozuno","kind":"company"},{"id":"nextdc-s3-sydney","slug":"nextdc-s3-sydney","name":"NEXTDC S3 Sydney","kind":"facility"}],"gaps":[{"id":"fam-gap-site-coverage","title":"Nine disclosed sites are a starting point","description":"This layer covers selected buildings and campuses in seven jurisdictions. It is not a census of regional facilities or evidence that every site hosts AI or military workloads.","entityIds":["nextdc-s3-sydney","elmina-business-park-1a","equinix-sg5","yotta-nm1","khazna-auh6","gastat-riyadh-data-center","rotem-bank-hapoalim"],"sourceIds":["fam-src-s3-multiplex","fam-src-elmina-gamuda","fam-src-sg5-equinix","fam-src-nm1-yotta","fam-src-auh6-launch","fam-src-gastat-alfanar","fam-src-rotem-electra"],"nextStep":"Add facility-level permits, utility records, disclosed subcontractors and dated handovers. Keep operating sites, contracted phases and proposed expansions distinct."},{"id":"fam-gap-om","title":"Operating and maintenance assignments remain unevenly disclosed","description":"S3 has a historical O&M scope; AUH6 has a specific solar O&M agreement; Yotta describes its on-site monitoring. Khazna NexOps is a portfolio organization. These records do not identify every current maintenance subcontractor.","entityIds":["nextdc-s3-sydney","khazna-auh6","khazna-nexops","yotta-nm1"],"sourceIds":["fam-src-s3-om-scope","fam-src-auh6-emerge","fam-src-khazna-nexops","fam-src-nm1-yotta"],"nextStep":"Obtain current service agreements, renewal dates, maintenance-package boundaries and responsible employers without exposing workers’ personal details."}],"snapshotDate":"2026-09-28"}