{"entity":{"id":"khazna-auh6","slug":"khazna-auh6","name":"Khazna AUH6","kind":"facility","summary":"Masdar City data center launched on 6 February 2024.","description":"Operator identifies 31.8MW IT capacity. EPC phase-one work and a solar plant are separately documented; potential phase-two capacity is not treated as delivered.","countryCodes":["AE"],"region":"Middle East","theme":"infrastructure","sourceIds":["fam-src-auh6-launch","fam-src-auh6-jlw","fam-src-auh6-emerge"],"origin":"global","reviewedAt":"2026-09-28"},"connections":[{"id":"fam-khazna-auh6-location","sourceId":"khazna-auh6","targetId":"country-ae","label":"Located in the UAE","description":"A physical location relationship; it does not assign ownership or financing to the national government.","kind":"located_in","status":"documented","sourceIds":["fam-src-auh6-launch"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-khazna-auh6-operator","sourceId":"khazna-data-centers","targetId":"khazna-auh6","label":"Launched and operates AUH6","description":"Khazna’s February 2024 launch identifies this named building and AI-related hosting.","kind":"facility_operator","status":"documented","sourceIds":["fam-src-auh6-launch"],"recordIds":[],"date":"2024-02-06","theme":"infrastructure"},{"id":"fam-jlw-auh6","sourceId":"jlw-middle-east","targetId":"khazna-auh6","label":"EPC JV lead — phase one","description":"Design, procurement, installation, testing and commissioning, including critical equipment.","kind":"epc_contractor","status":"documented","sourceIds":["fam-src-auh6-jlw"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-mclaren-auh6","sourceId":"mclaren-construction","targetId":"khazna-auh6","label":"EPC joint-venture partner","description":"Named alongside JLW for phase-one delivery.","kind":"epc_contractor","status":"documented","sourceIds":["fam-src-auh6-jlw"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-red-auh6","sourceId":"red-engineering","targetId":"khazna-auh6","label":"Engineer / design consultant","description":"Named in the contractor project schedule.","kind":"design_consultant","status":"documented","sourceIds":["fam-src-auh6-jlw"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-bge-auh6","sourceId":"bge","targetId":"khazna-auh6","label":"Design consultant","description":"Named in the contractor project schedule.","kind":"design_consultant","status":"documented","sourceIds":["fam-src-auh6-jlw"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-aesg-auh6","sourceId":"aesg","targetId":"khazna-auh6","label":"Design consultant","description":"Named in the contractor project schedule.","kind":"design_consultant","status":"documented","sourceIds":["fam-src-auh6-jlw"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-emerge-auh6","sourceId":"emerge-energy","targetId":"khazna-auh6","label":"Solar plant: design, build and 25-year O&M","description":"Agreement covers the 7MWp PV plant serving AUH6; not the data center’s entire maintenance scope or all electricity demand.","kind":"operations_maintenance","status":"documented","sourceIds":["fam-src-auh6-emerge"],"recordIds":[],"date":"2022-10-18","theme":"infrastructure"},{"id":"proposal-facility-levy-khazna-auh6","sourceId":"khazna-auh6","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[],"sources":[{"id":"fam-src-s3-multiplex","title":"Multiplex completes Stage Two of NEXTDC S3 Sydney","url":"https://www.multiplex.global/news/multiplex-completes-stage-two-of-nextdc-s-s3-sydney-data-centre-strengthening-sydney-s-next-gen-digital-footprint/","publisher":"Multiplex","publishedAt":"2023-06-14","accessedAt":"2026-09-28","kind":"primary","note":"Contractor completion statement: Stage Two; Stage One was already occupied during these works."},{"id":"fam-src-s3-om-scope","title":"NEXTDC ISO/IEC 27001 certificate ITGOV40020 — historical O&M scope","url":"https://nextdc.com/hubfs/ISO_27001_Certification_Final.pdf","publisher":"Intertek SAI Global / NEXTDC","publishedAt":"2024-05-31","accessedAt":"2026-09-28","kind":"primary","note":"Pages 1 and 6 explicitly include operations and maintenance at S3 Artarmon. This copy expired 16 May 2025; it is historical role evidence, not proof of current certification."},{"id":"fam-src-elmina-gamuda","title":"Gamuda secures contracts for Elmina Business Park hyperscale data centre","url":"https://gamuda.com/2024/05/gamuda-secures-rm1-74-billion-contract-for-hyperscale-data-centre-in-elmina-business-park/press-releases/","publisher":"Gamuda Berhad","publishedAt":"2024-05-24","accessedAt":"2026-09-28","kind":"primary","note":"Separate construction and MEP awards. Original target dates are not evidence of actual completion or payments."},{"id":"fam-src-sg5-equinix","title":"Equinix expands its fifth Singapore data center, SG5","url":"https://newsroom.equinix.com/2022-04-21-Equinix-Supports-Singapores-Green-Plan-and-Regional-Digital-Hub-Ambitions-by-Expanding-Its-Fifth-Data-Center","publisher":"Equinix","publishedAt":"2022-04-21","accessedAt":"2026-09-28","kind":"primary","note":"SG5 is a specific nine-storey facility in Tanjong Kling. Expansion announcement is not a disbursement account."},{"id":"fam-src-nm1-yotta","title":"Inside Yotta NM1","url":"https://colocation.yotta.com/blog/inside-yotta-nm1-asias-largest-tier-iv-data-center/","publisher":"Yotta","publishedAt":"2024-11-27","accessedAt":"2026-09-28","kind":"primary","note":"Operator account of the named Navi Mumbai building, on-site management and Shakti Cloud. Marketing performance/sustainability claims are not adopted as independent measurements."},{"id":"fam-src-auh6-jlw","title":"Khazna AUH6 — EPC project record","url":"https://jlwme.com/project/khazna-auh6/","publisher":"James L. Williams Middle East","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Names EPC joint venture and design consultants; phase-one 31.8MW versus potential 60MW across both phases. The latter is not entered as delivered capacity."},{"id":"fam-src-auh6-launch","title":"Khazna launches AUH6 in Masdar City","url":"https://khaznadatacenters.com/press-release/khazna-data-centers-fuels-uaes-digital-future-with-the-launch-of-hyperscale-ai-ready-data-center-in-masdar-city/","publisher":"Khazna Data Centers","publishedAt":"2024-02-06","accessedAt":"2026-09-28","kind":"primary","note":"Operator launch identifies location, AI-related hosting and 31.8MW IT capacity; no individual hyperscaler tenant is named."},{"id":"fam-src-auh6-emerge","title":"Emerge agreement for Khazna AUH6 solar plant","url":"https://masdar.ae/en/news/newsroom/emerge-signs-agreement-to-develop-solar-plant","publisher":"Masdar","publishedAt":"2022-10-18","accessedAt":"2026-09-28","kind":"primary","note":"Emerge agreement covers financing, design, procurement, construction and 25-year O&M of the 7MWp solar plant serving AUH6, not all data-center equipment."},{"id":"fam-src-khazna-nexops","title":"Khazna announces its in-house NexOps organization","url":"https://khaznadatacenters.com/press-release/khazna-sets-a-new-standard-for-mission-critical-data-center-operations-with-launch-of-khazna-nexops/","publisher":"Khazna Data Centers","publishedAt":"2026-02-09","accessedAt":"2026-09-28","kind":"primary","note":"Portfolio-level operating organization, reported as supporting over 30 centers. Site assignments and individual maintenance agreements are not disclosed here."},{"id":"fam-src-gastat-alfanar","title":"GASTAT Data Center Project","url":"https://alfanarprojects.com/en-us/projects/gastat-data-center-project/","publisher":"Alfanar Projects","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Contractor labels the project completed and gives civil/electromechanical/cabling scope; completion date and current O&M provider are not disclosed."},{"id":"fam-src-rotem-electra","title":"Data Center Rotem — Bank Hapoalim","url":"https://www.electra.co.il/en/electra_building/projects/data_center_rotem_-_bank_hapoalim","publisher":"Electra Group","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Separately names construction, M&E, backup-generator and elevator roles. Current maintenance assignments are not given."}],"neighbors":[{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"country-ae","slug":"country-ae","name":"United Arab Emirates","kind":"country"},{"id":"khazna-data-centers","slug":"khazna-data-centers","name":"Khazna Data Centers","kind":"company"},{"id":"jlw-middle-east","slug":"jlw-middle-east","name":"James L. Williams Middle East","kind":"company"},{"id":"mclaren-construction","slug":"mclaren-construction","name":"McLaren Construction","kind":"company"},{"id":"red-engineering","slug":"red-engineering","name":"RED Engineering","kind":"company"},{"id":"bge","slug":"bge","name":"BG&E","kind":"company"},{"id":"aesg","slug":"aesg","name":"AESG","kind":"company"},{"id":"emerge-energy","slug":"emerge-energy","name":"Emerge","kind":"company"},{"id":"khazna-auh6","slug":"khazna-auh6","name":"Khazna AUH6","kind":"facility"}],"gaps":[{"id":"fam-gap-site-coverage","title":"Nine disclosed sites are a starting point","description":"This layer covers selected buildings and campuses in seven jurisdictions. It is not a census of regional facilities or evidence that every site hosts AI or military workloads.","entityIds":["nextdc-s3-sydney","elmina-business-park-1a","equinix-sg5","yotta-nm1","khazna-auh6","gastat-riyadh-data-center","rotem-bank-hapoalim"],"sourceIds":["fam-src-s3-multiplex","fam-src-elmina-gamuda","fam-src-sg5-equinix","fam-src-nm1-yotta","fam-src-auh6-launch","fam-src-gastat-alfanar","fam-src-rotem-electra"],"nextStep":"Add facility-level permits, utility records, disclosed subcontractors and dated handovers. Keep operating sites, contracted phases and proposed expansions distinct."},{"id":"fam-gap-om","title":"Operating and maintenance assignments remain unevenly disclosed","description":"S3 has a historical O&M scope; AUH6 has a specific solar O&M agreement; Yotta describes its on-site monitoring. Khazna NexOps is a portfolio organization. These records do not identify every current maintenance subcontractor.","entityIds":["nextdc-s3-sydney","khazna-auh6","khazna-nexops","yotta-nm1"],"sourceIds":["fam-src-s3-om-scope","fam-src-auh6-emerge","fam-src-khazna-nexops","fam-src-nm1-yotta"],"nextStep":"Obtain current service agreements, renewal dates, maintenance-package boundaries and responsible employers without exposing workers’ personal details."}],"snapshotDate":"2026-09-28"}