{"entity":{"id":"facility-northc-groningen","slug":"facility-northc-groningen","name":"NorthC Groningen campus","kind":"facility","countryCodes":["NL"],"summary":"Groningen campus with documented fire-system subcontracting.","description":"NorthC lists Groningen 1 and 2. FireX’s third-hall case identifies the campus but not the numbered building; that uncertainty is preserved.","sourceIds":["fe-src-northc-owner","fe-src-northc-firex"],"region":"Europe","theme":"infrastructure","origin":"global","reviewedAt":"2026-09-28"},"connections":[{"id":"fe-northc-groningen","sourceId":"northc","targetId":"facility-northc-groningen","label":"Listed campus operator","description":"NorthC publishes a combined Groningen 1 and 2 location listing.","kind":"facility_operator","status":"documented","sourceIds":["fe-src-northc-owner"],"date":null,"recordIds":[],"theme":"infrastructure"},{"id":"fe-hamer-groningen-install","sourceId":"hamer","targetId":"facility-northc-groningen","label":"Main contractor and installer","description":"Hamer installed the water-mist system in the third-hall project described by FireX.","kind":"fire_protection_contractor","status":"documented","sourceIds":["fe-src-northc-firex"],"date":null,"recordIds":[],"theme":"infrastructure"},{"id":"fe-firex-groningen-design","sourceId":"firex","targetId":"facility-northc-groningen","label":"Design and supply","description":"FireX designed and supplied the water-mist system to Hamer.","kind":"equipment_design_supply","status":"documented","sourceIds":["fe-src-northc-firex"],"date":null,"recordIds":[],"theme":"infrastructure"},{"id":"fe-firex-groningen-commission","sourceId":"firex","targetId":"facility-northc-groningen","label":"Commissioning","description":"FireX commissioned the system after Hamer’s installation. A maintenance appointment is not established.","kind":"commissioning_contractor","status":"documented","sourceIds":["fe-src-northc-firex"],"date":null,"recordIds":[],"theme":"infrastructure"},{"id":"fe-facility-northc-groningen-location","sourceId":"facility-northc-groningen","targetId":"country-nl","label":"Located in","description":"Geographic context; this edge does not imply government ownership or funding.","kind":"location","status":"documented","sourceIds":["fe-src-northc-owner"],"date":null,"recordIds":[],"theme":"infrastructure"},{"id":"proposal-facility-levy-facility-northc-groningen","sourceId":"facility-northc-groningen","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[],"sources":[{"id":"fe-src-ld10","title":"LD10 Data Centre","url":"https://www.mercuryeng.com/project/ld10-data-centre/","publisher":"Mercury","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Historical project period May 2017–October 2019. Client explicitly confidential; the facility code is not used to infer an operator."},{"id":"fe-src-svg-schneider","title":"Green Mountain creates data-center harmony with nature","url":"https://blog.se.com/datacenter/2015/10/01/green-mountain-creates-data-center-harmony-with-nature/","publisher":"Schneider Electric","publishedAt":"2015-10-01","accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Historical supplier account identifies Rennesøy, cooling design and installed infrastructure. Marketing claims of zero emissions are not adopted; no maintenance contract is established."},{"id":"fe-src-fra7-spie","title":"SPIE builds AI-enabled data centre for firstcolo in Rosbach vor der Höhe","url":"https://www.spie.com/en/news/spie-builds-ai-enabled-data-centre-firstcolo-rosbach-vor-der-hohe-germany","publisher":"SPIE","publishedAt":"2026-06-30","accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Construction announcement: ground-breaking June 2026; phased completion forecast by end-2028. Named scopes are assignments, not proof of completed work."},{"id":"fe-src-northc-owner","title":"Groningen 1 & 2 data center","url":"https://www.northcdatacenters.com/en/northc-datacenters/groningen/","publisher":"NorthC","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Operator lists its Groningen campus. Contractor case does not identify which numbered building contains the third-hall project."},{"id":"fe-src-northc-firex","title":"NorthC Datacenter, Groningen","url":"https://www.firex.nl/en/projecten/northc-datacenter-groningen/","publisher":"FireX","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Explicit scope split: FireX designed, supplied and commissioned; Hamer installed. Generic maintenance offerings on the page are not a site maintenance appointment."},{"id":"fe-src-colt-spie","title":"Efficiënt onderhoud en beheer van datacenters bij Colt Technology Services","url":"https://www.spie-nl.com/project/efficient-onderhoud-en-beheer-van-datacenters-bij-colt-technology-services","publisher":"SPIE Netherlands","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Undated contractor-hosted case, credited to Datacenterworks. Names Amsterdam and Roosendaal, M&E maintenance and 24/7 hands-and-eyes services; current site ownership and contract continuity remain unverified."}],"neighbors":[{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"country-nl","slug":"country-nl","name":"Netherlands","kind":"country"},{"id":"northc","slug":"northc","name":"NorthC","kind":"company"},{"id":"hamer","slug":"hamer","name":"Hamer","kind":"company"},{"id":"firex","slug":"firex","name":"FireX","kind":"company"},{"id":"facility-northc-groningen","slug":"facility-northc-groningen","name":"NorthC Groningen campus","kind":"facility"}],"gaps":[{"id":"fe-gap-identity","title":"Facility identity needs careful matching","description":"LD10’s client is confidential. The NorthC case does not identify its numbered Groningen building. Historical Colt names are not automatically mapped to a later operator.","entityIds":["facility-ld10-mercury-project","facility-northc-groningen","facility-colt-amsterdam","facility-colt-roosendaal"],"sourceIds":["fe-src-ld10","fe-src-northc-firex","fe-src-colt-spie"],"nextStep":"Use planning references or dated operator records to resolve identity without guessing from similar names."},{"id":"fe-gap-lifecycle","title":"Different stages, different responsibilities","description":"A named builder, installer or equipment supplier is not automatically a maintenance provider. FRA7 remains a construction-stage record; announcements do not establish completed commissioning.","entityIds":["facility-firstcolo-fra7","facility-svg-rennesoy","facility-northc-groningen"],"sourceIds":["fe-src-fra7-spie","fe-src-svg-schneider","fe-src-northc-firex"],"nextStep":"Add completion certificates and separately sourced operating appointments as they become public."}],"snapshotDate":"2026-09-28"}