{"entity":{"id":"facility-fra17","slug":"facility-fra17","name":"FRA17 · Digital Park Fechenheim","kind":"facility","countryCodes":["DE"],"summary":"Frankfurt facility handed over in 2023.","description":"Mercury documented completion of the first colocation building on Digital Realty’s Fechenheim campus. The cited construction appointment began in October 2021.","sourceIds":["fe-src-fra17"],"region":"Europe","theme":"infrastructure","origin":"global","reviewedAt":"2026-09-28"},"connections":[{"id":"fe-digital-realty-fra17","sourceId":"digital-realty","targetId":"facility-fra17","label":"Project client","description":"Digital Realty is the named client at the documented handover.","kind":"project_client","status":"documented","sourceIds":["fe-src-fra17"],"date":"2023-06-23","recordIds":[],"theme":"infrastructure"},{"id":"fe-mercury-fra17-build","sourceId":"mercury","targetId":"facility-fra17","label":"Prime contractor","description":"October 2021 appointment; civil, structural and architectural works completed by the 2023 announcement.","kind":"general_contractor","status":"documented","sourceIds":["fe-src-fra17"],"date":"2023-06-23","recordIds":[],"theme":"infrastructure"},{"id":"fe-mercury-fra17-electrical","sourceId":"mercury","targetId":"facility-fra17","label":"Electrical installation","description":"Construction scope included power distribution and generator installation.","kind":"electrical_contractor","status":"documented","sourceIds":["fe-src-fra17"],"date":"2023-06-23","recordIds":[],"theme":"infrastructure"},{"id":"fe-mercury-fra17-mechanical","sourceId":"mercury","targetId":"facility-fra17","label":"Mechanical installation","description":"Construction scope included water-production, ventilation and fire-suppression systems.","kind":"mechanical_contractor","status":"documented","sourceIds":["fe-src-fra17"],"date":"2023-06-23","recordIds":[],"theme":"infrastructure"},{"id":"fe-facility-fra17-location","sourceId":"facility-fra17","targetId":"country-de","label":"Located in","description":"Geographic context; this edge does not imply government ownership or funding.","kind":"location","status":"documented","sourceIds":["fe-src-fra17"],"date":null,"recordIds":[],"theme":"infrastructure"},{"id":"proposal-facility-levy-facility-fra17","sourceId":"facility-fra17","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[],"sources":[{"id":"fe-src-fra17","title":"Mercury completes FRA17 on Digital Realty’s Frankfurt campus","url":"https://www.mercuryeng.com/2023/06/23/mercury-completes-fra17-the-first-operational-data-centre-on-digital-realtys-new-campus-in-frankfurt/","publisher":"Mercury","publishedAt":"2023-06-23","accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Contractor completion announcement; appointment was October 2021. General corporate maintenance capabilities do not establish a FRA17 maintenance contract."},{"id":"fe-src-paris","title":"Paris Digital Park project case study","url":"https://www.mercuryeng.com/project/paris-digital-park-data-centre-campus/","publisher":"Mercury","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"Undated portfolio page; identifies project period 2020–2025 and PAR8–PAR11 campus."},{"id":"fe-src-hamar-handover","title":"Green Mountain delivers first data-center building to TikTok","url":"https://greenmountain.no/green-mountain-delivers-first-data-center-building-to-tiktok/","publisher":"Green Mountain","publishedAt":"2023-11-30","accessedAt":"2026-09-28","kind":"primary-project-disclosure","note":"First-building handover precedes customer equipment installation. It is not a campus-wide operational commencement date."}],"neighbors":[{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"country-de","slug":"country-de","name":"Germany","kind":"country"},{"id":"digital-realty","slug":"digital-realty","name":"Digital Realty","kind":"company"},{"id":"mercury","slug":"mercury","name":"Mercury","kind":"company"},{"id":"facility-fra17","slug":"facility-fra17","name":"FRA17 · Digital Park Fechenheim","kind":"facility"}],"gaps":[{"id":"fe-gap-workloads","title":"Facility links do not identify every workload","description":"These project disclosures establish infrastructure relationships. They do not identify every tenant, AI workload, military customer, contract payment or measured environmental impact.","entityIds":["facility-fra17","facility-paris-digital-park","facility-osl-hamar"],"sourceIds":["fe-src-fra17","fe-src-paris","fe-src-hamar-handover"],"nextStep":"Link any workload, funding or emissions claim to its own site-specific evidence."}],"snapshotDate":"2026-09-28"}