{"entity":{"id":"equinix-sg5","slug":"equinix-sg5","name":"Equinix SG5","kind":"facility","summary":"Nine-storey Tanjong Kling data center, with a documented 2022 expansion and plumbing supplier.","description":"Equinix’s April 2022 release describes added operating capacity. Master’s undated portfolio names specific building-services work; it does not identify an ongoing maintenance agreement.","countryCodes":["SG"],"region":"Asia-Pacific","theme":"infrastructure","sourceIds":["fam-src-sg5-equinix","fam-src-sg5-master"],"origin":"global","reviewedAt":"2026-09-28"},"connections":[{"id":"fam-equinix-sg5-location","sourceId":"equinix-sg5","targetId":"country-sg","label":"Located in Singapore","description":"A physical location relationship; it does not assign ownership or financing to the national government.","kind":"located_in","status":"documented","sourceIds":["fam-src-sg5-equinix"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"fam-equinix-sg5","sourceId":"equinix","targetId":"equinix-sg5","label":"Operates and expands SG5","description":"Equinix’s 2022 release describes the facility expansion.","kind":"facility_operator","status":"documented","sourceIds":["fam-src-sg5-equinix"],"recordIds":["fam-fin-sg5-expansion"],"date":"2022-04-21","theme":"infrastructure"},{"id":"fam-master-sg5","sourceId":"master-construction-works","targetId":"equinix-sg5","label":"Plumbing and cooling-water transfer","description":"Supplier portfolio lists sanitary/plumbing work and AC make-up transfer for the cooling tower; appointment hierarchy undisclosed.","kind":"building_services","status":"documented","sourceIds":["fam-src-sg5-master"],"recordIds":[],"date":null,"theme":"infrastructure"},{"id":"proposal-facility-levy-equinix-sg5","sourceId":"equinix-sg5","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[{"id":"fam-fin-sg5-expansion","title":"Equinix SG5 announced expansion investment","sourceId":"equinix","targetId":"equinix-sg5","amount":"86000000","amountLabel":"USD 86 million","currency":"USD","valueKind":"announced_investment","date":"2022-04-21","period":"2022 expansion announcement","status":"documented","sourceIds":["fam-src-sg5-equinix"],"countryCodes":["SG"],"note":"Company-announced investment associated with expansion, not an audited payment total or the cost of every SG5 phase.","origin":"global"}],"sources":[{"id":"fam-src-s3-multiplex","title":"Multiplex completes Stage Two of NEXTDC S3 Sydney","url":"https://www.multiplex.global/news/multiplex-completes-stage-two-of-nextdc-s-s3-sydney-data-centre-strengthening-sydney-s-next-gen-digital-footprint/","publisher":"Multiplex","publishedAt":"2023-06-14","accessedAt":"2026-09-28","kind":"primary","note":"Contractor completion statement: Stage Two; Stage One was already occupied during these works."},{"id":"fam-src-elmina-gamuda","title":"Gamuda secures contracts for Elmina Business Park hyperscale data centre","url":"https://gamuda.com/2024/05/gamuda-secures-rm1-74-billion-contract-for-hyperscale-data-centre-in-elmina-business-park/press-releases/","publisher":"Gamuda Berhad","publishedAt":"2024-05-24","accessedAt":"2026-09-28","kind":"primary","note":"Separate construction and MEP awards. Original target dates are not evidence of actual completion or payments."},{"id":"fam-src-sg5-equinix","title":"Equinix expands its fifth Singapore data center, SG5","url":"https://newsroom.equinix.com/2022-04-21-Equinix-Supports-Singapores-Green-Plan-and-Regional-Digital-Hub-Ambitions-by-Expanding-Its-Fifth-Data-Center","publisher":"Equinix","publishedAt":"2022-04-21","accessedAt":"2026-09-28","kind":"primary","note":"SG5 is a specific nine-storey facility in Tanjong Kling. Expansion announcement is not a disbursement account."},{"id":"fam-src-sg5-master","title":"Equinix Data Center SG5 — project portfolio","url":"https://mastergroup.sg/equinix-data-center-sg5/","publisher":"Master Construction Works","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Lists plumbing/sanitary works and the cooling-tower AC make-up transfer system. Appointment chain and package dates are not given."},{"id":"fam-src-nm1-yotta","title":"Inside Yotta NM1","url":"https://colocation.yotta.com/blog/inside-yotta-nm1-asias-largest-tier-iv-data-center/","publisher":"Yotta","publishedAt":"2024-11-27","accessedAt":"2026-09-28","kind":"primary","note":"Operator account of the named Navi Mumbai building, on-site management and Shakti Cloud. Marketing performance/sustainability claims are not adopted as independent measurements."},{"id":"fam-src-auh6-launch","title":"Khazna launches AUH6 in Masdar City","url":"https://khaznadatacenters.com/press-release/khazna-data-centers-fuels-uaes-digital-future-with-the-launch-of-hyperscale-ai-ready-data-center-in-masdar-city/","publisher":"Khazna Data Centers","publishedAt":"2024-02-06","accessedAt":"2026-09-28","kind":"primary","note":"Operator launch identifies location, AI-related hosting and 31.8MW IT capacity; no individual hyperscaler tenant is named."},{"id":"fam-src-gastat-alfanar","title":"GASTAT Data Center Project","url":"https://alfanarprojects.com/en-us/projects/gastat-data-center-project/","publisher":"Alfanar Projects","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Contractor labels the project completed and gives civil/electromechanical/cabling scope; completion date and current O&M provider are not disclosed."},{"id":"fam-src-rotem-electra","title":"Data Center Rotem — Bank Hapoalim","url":"https://www.electra.co.il/en/electra_building/projects/data_center_rotem_-_bank_hapoalim","publisher":"Electra Group","publishedAt":null,"accessedAt":"2026-09-28","kind":"primary","note":"Separately names construction, M&E, backup-generator and elevator roles. Current maintenance assignments are not given."}],"neighbors":[{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"equinix","slug":"equinix","name":"Equinix","kind":"company"},{"id":"master-construction-works","slug":"master-construction-works","name":"Master Construction Works","kind":"company"},{"id":"country-sg","slug":"country-sg","name":"Singapore","kind":"country"},{"id":"equinix-sg5","slug":"equinix-sg5","name":"Equinix SG5","kind":"facility"}],"gaps":[{"id":"fam-gap-site-coverage","title":"Nine disclosed sites are a starting point","description":"This layer covers selected buildings and campuses in seven jurisdictions. It is not a census of regional facilities or evidence that every site hosts AI or military workloads.","entityIds":["nextdc-s3-sydney","elmina-business-park-1a","equinix-sg5","yotta-nm1","khazna-auh6","gastat-riyadh-data-center","rotem-bank-hapoalim"],"sourceIds":["fam-src-s3-multiplex","fam-src-elmina-gamuda","fam-src-sg5-equinix","fam-src-nm1-yotta","fam-src-auh6-launch","fam-src-gastat-alfanar","fam-src-rotem-electra"],"nextStep":"Add facility-level permits, utility records, disclosed subcontractors and dated handovers. Keep operating sites, contracted phases and proposed expansions distinct."}],"snapshotDate":"2026-09-28"}