{"entity":{"id":"digitalbridge","slug":"digitalbridge","name":"DigitalBridge","kind":"investment_manager","summary":"Digital-infrastructure investment manager.","description":"Managed investment vehicles co-led Vantage’s 2024 equity financing.","countryCodes":["US"],"region":"North America","theme":"capital","sourceIds":["cp-src-vantage-equity"],"origin":"global","reviewedAt":"2026-09-28"},"connections":[{"id":"cp-digitalbridge-vantage","sourceId":"digitalbridge","targetId":"vantage-data-centers","label":"Vehicles co-led equity round","description":"DigitalBridge-managed vehicles co-led the completed 2024 round; the headline covers all participating investors.","kind":"managed_equity_investment","status":"documented","sourceIds":["cp-src-vantage-equity"],"recordIds":["cp-fin-vantage"],"date":"2024-06-13","theme":"capital"},{"id":"cp-digitalbridge-coreweave","sourceId":"digitalbridge","targetId":"coreweave","label":"Participated in 2023 debt facility","description":"DigitalBridge is named in the same syndicated facility. This debt role differs from its Vantage equity investment.","kind":"corporate_credit_participation","status":"documented","sourceIds":["cp-src-coreweave-debt"],"recordIds":["cp-fin-coreweave-debt"],"date":"2023-08-03","theme":"capital"}],"finance":[{"id":"cp-fin-vantage","title":"Vantage: completed multi-investor equity round","sourceId":null,"targetId":"vantage-data-centers","amount":"9200000000","amountLabel":"USD 9.2 billion aggregate equity investment","currency":"USD","valueKind":"completed_equity_round","date":"2024-06-13","period":"Closed June 2024","status":"documented","sourceIds":["cp-src-vantage-equity"],"countryCodes":["US"],"note":"Whole round led by managed DigitalBridge and Silver Lake vehicles. Individual contributions are undisclosed; do not duplicate the total across both lead-investor edges. Includes primary and other equity, not a USD 9.2 billion construction-spending claim.","origin":"global"},{"id":"cp-fin-coreweave-debt","title":"CoreWeave: 2023 syndicated debt facility","sourceId":null,"targetId":"coreweave","amount":"2300000000","amountLabel":"USD 2.3 billion debt facility","currency":"USD","valueKind":"corporate_credit_facility","date":"2023-08-03","period":"Historical facility announced August 2023","status":"documented","sourceIds":["cp-src-coreweave-debt"],"countryCodes":["US"],"note":"Full facility co-led by Blackstone and Magnetar with other participants. No lender-specific amount or current outstanding balance is supplied.","origin":"global"}],"sources":[{"id":"cp-src-vantage-equity","title":"Vantage completes USD 9.2 billion equity investment","url":"https://vantage-dc.com/news/vantage-data-centers-completes-9-2-billion-equity-investment-led-by-digitalbridge-and-silver-lake/","publisher":"Vantage Data Centers","publishedAt":"2024-06-13","accessedAt":"2026-09-28","kind":"primary","note":"Full multi-investor round; investor-by-investor amounts are not disclosed here. Prior AustralianSuper investment is separate."},{"id":"cp-src-crusoe-jv","title":"Abilene joint venture expands to USD 15 billion","url":"https://www.crusoe.ai/resources/newsroom/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-joint-venture","publisher":"Crusoe","publishedAt":"2025-05-21","accessedAt":"2026-09-28","kind":"primary","note":"Joint-venture funding envelope covering the expanded campus, not each sponsor’s contribution or verified spending."},{"id":"cp-src-coreweave-debt","title":"CoreWeave announces USD 2.3 billion debt facility","url":"https://www.coreweave.com/blog/coreweave-secures-2-3-billion-debt-financing-magnetar-capital-blackstone","publisher":"CoreWeave","publishedAt":"2023-08-03","accessedAt":"2026-09-28","kind":"primary","note":"Named lending leads and participants. This historical debt facility is not equity ownership or a current debt-balance estimate."}],"neighbors":[{"id":"digitalbridge","slug":"digitalbridge","name":"DigitalBridge","kind":"investment_manager"},{"id":"vantage-data-centers","slug":"vantage-data-centers","name":"Vantage Data Centers","kind":"data_center_operator"},{"id":"coreweave","slug":"coreweave","name":"CoreWeave","kind":"cloud_operator"}],"gaps":[{"id":"cp-gap-investor-allocations","title":"Who supplies the capital behind each investment vehicle?","description":"The mapped rounds name leads or sponsors but usually do not disclose investor allocations, limited partners, drawdowns or project-level beneficial ownership.","entityIds":["blackstone","digitalbridge","crusoe","blue-owl-capital"],"sourceIds":["cp-src-vantage-equity","cp-src-crusoe-jv","cp-src-coreweave-debt"],"nextStep":"Request vehicle-level filings, ownership schedules and debt drawdown records; do not allocate a whole round to every named participant."}],"snapshotDate":"2026-09-28"}