{"entity":{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy","summary":"Proposed sector-wide coverage for the mandatory regeneration levy.","description":"The proposal covers AI companies and data-center operators across jurisdictions. The assessment base, rate, collection method and legal scope remain policy design questions; no existing tax or payment is asserted.","countryCodes":[],"region":"Transnational","theme":"regeneration","sourceIds":[],"origin":"core","reviewedAt":"2026-09-27"},"connections":[{"id":"levy-scope-google","sourceId":"google","targetId":"covered-ai-data-center-sector","label":"Proposed sector coverage","description":"This AI/cloud business is included in the proposed scope of a mandatory levy. This is a policy design connection, not an existing assessment or payment.","kind":"funds","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"levy-scope-amazon","sourceId":"amazon","targetId":"covered-ai-data-center-sector","label":"Proposed sector coverage","description":"This AI/cloud business is included in the proposed scope of a mandatory levy. This is a policy design connection, not an existing assessment or payment.","kind":"funds","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"levy-scope-microsoft","sourceId":"microsoft","targetId":"covered-ai-data-center-sector","label":"Proposed sector coverage","description":"This AI/cloud business is included in the proposed scope of a mandatory levy. This is a policy design connection, not an existing assessment or payment.","kind":"funds","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"levy-scope-openai","sourceId":"openai","targetId":"covered-ai-data-center-sector","label":"Proposed sector coverage","description":"This AI/cloud business is included in the proposed scope of a mandatory levy. This is a policy design connection, not an existing assessment or payment.","kind":"funds","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"levy-scope-anthropic","sourceId":"anthropic","targetId":"covered-ai-data-center-sector","label":"Proposed sector coverage","description":"This AI/cloud business is included in the proposed scope of a mandatory levy. This is a policy design connection, not an existing assessment or payment.","kind":"funds","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"levy-scope-xai","sourceId":"xai","targetId":"covered-ai-data-center-sector","label":"Proposed sector coverage","description":"This AI/cloud business is included in the proposed scope of a mandatory levy. This is a policy design connection, not an existing assessment or payment.","kind":"funds","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"sector-regeneration-levy","sourceId":"covered-ai-data-center-sector","targetId":"regeneration-fund","label":"Mandatory regeneration levy proposal","description":"Covered AI and data-center activities would finance community-directed regeneration, research and lasting paid work. The assessment basis and collection design are not predetermined.","kind":"funds","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-vantage-az1-goodyear","sourceId":"vantage-az1-goodyear","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-yahoo-lockport-data-center","sourceId":"yahoo-lockport-data-center","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-meta-richland-parish","sourceId":"meta-richland-parish","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-serverfarm-tor2-1","sourceId":"serverfarm-tor2-1","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-rbc-guelph-computing-centre","sourceId":"rbc-guelph-computing-centre","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-digital-realty-markham-data-centre","sourceId":"digital-realty-markham-data-centre","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-maz-mesa-data-center","sourceId":"maz-mesa-data-center","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-equinix-sp3","sourceId":"equinix-sp3","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-itau-mogi-mirim-data-center","sourceId":"itau-mogi-mirim-data-center","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-fra17","sourceId":"facility-fra17","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-paris-digital-park","sourceId":"facility-paris-digital-park","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-ld10-mercury-project","sourceId":"facility-ld10-mercury-project","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-mentor-graphics-clare","sourceId":"facility-mentor-graphics-clare","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-osl-hamar","sourceId":"facility-osl-hamar","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-svg-rennesoy","sourceId":"facility-svg-rennesoy","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-firstcolo-fra7","sourceId":"facility-firstcolo-fra7","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-northc-groningen","sourceId":"facility-northc-groningen","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-colt-amsterdam","sourceId":"facility-colt-amsterdam","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-facility-colt-roosendaal","sourceId":"facility-colt-roosendaal","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-nextdc-s3-sydney","sourceId":"nextdc-s3-sydney","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-nextdc-s6-sydney","sourceId":"nextdc-s6-sydney","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-elmina-business-park-1a","sourceId":"elmina-business-park-1a","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-equinix-sg5","sourceId":"equinix-sg5","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-yotta-nm1","sourceId":"yotta-nm1","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-khazna-auh6","sourceId":"khazna-auh6","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-khazna-dxb2","sourceId":"khazna-dxb2","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-gastat-riyadh-data-center","sourceId":"gastat-riyadh-data-center","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-rotem-bank-hapoalim","sourceId":"rotem-bank-hapoalim","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-facility-levy-abilene-lancium-campus","sourceId":"abilene-lancium-campus","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-operator-levy-airtrunk","sourceId":"airtrunk","targetId":"covered-ai-data-center-sector","label":"Proposed operator levy scope","description":"This operator’s AI/cloud or data-center activities belong to the proposed sector-wide assessment. This is a policy proposal; legal boundaries, tax base, rate and jurisdiction remain to be determined. No existing payment or liability is asserted.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-operator-levy-qts","sourceId":"qts","targetId":"covered-ai-data-center-sector","label":"Proposed operator levy scope","description":"This operator’s AI/cloud or data-center activities belong to the proposed sector-wide assessment. This is a policy proposal; legal boundaries, tax base, rate and jurisdiction remain to be determined. No existing payment or liability is asserted.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-operator-levy-vantage-data-centers","sourceId":"vantage-data-centers","targetId":"covered-ai-data-center-sector","label":"Proposed operator levy scope","description":"This operator’s AI/cloud or data-center activities belong to the proposed sector-wide assessment. This is a policy proposal; legal boundaries, tax base, rate and jurisdiction remain to be determined. No existing payment or liability is asserted.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-operator-levy-crusoe","sourceId":"crusoe","targetId":"covered-ai-data-center-sector","label":"Proposed operator levy scope","description":"This operator’s AI/cloud or data-center activities belong to the proposed sector-wide assessment. This is a policy proposal; legal boundaries, tax base, rate and jurisdiction remain to be determined. No existing payment or liability is asserted.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-operator-levy-coreweave","sourceId":"coreweave","targetId":"covered-ai-data-center-sector","label":"Proposed operator levy scope","description":"This operator’s AI/cloud or data-center activities belong to the proposed sector-wide assessment. This is a policy proposal; legal boundaries, tax base, rate and jurisdiction remain to be determined. No existing payment or liability is asserted.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-operator-levy-sttgdc","sourceId":"sttgdc","targetId":"covered-ai-data-center-sector","label":"Proposed operator levy scope","description":"This operator’s AI/cloud or data-center activities belong to the proposed sector-wide assessment. This is a policy proposal; legal boundaries, tax base, rate and jurisdiction remain to be determined. No existing payment or liability is asserted.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"},{"id":"proposal-operator-levy-oracle","sourceId":"oracle","targetId":"covered-ai-data-center-sector","label":"Proposed operator levy scope","description":"This operator’s AI/cloud or data-center activities belong to the proposed sector-wide assessment. This is a policy proposal; legal boundaries, tax base, rate and jurisdiction remain to be determined. No existing payment or liability is asserted.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[],"sources":[],"neighbors":[{"id":"google","slug":"google","name":"Google","kind":"company"},{"id":"amazon","slug":"amazon","name":"Amazon Web Services","kind":"company"},{"id":"microsoft","slug":"microsoft","name":"Microsoft","kind":"company"},{"id":"openai","slug":"openai","name":"OpenAI","kind":"company"},{"id":"anthropic","slug":"anthropic","name":"Anthropic","kind":"company"},{"id":"xai","slug":"xai","name":"xAI","kind":"company"},{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"regeneration-fund","slug":"regeneration-fund","name":"Regeneration fund","kind":"policy"},{"id":"vantage-az1-goodyear","slug":"vantage-az1-goodyear","name":"Vantage AZ1 · Goodyear","kind":"facility"},{"id":"yahoo-lockport-data-center","slug":"yahoo-lockport-data-center","name":"Yahoo · Lockport data center","kind":"facility"},{"id":"meta-richland-parish","slug":"meta-richland-parish","name":"Meta · Richland Parish","kind":"facility"},{"id":"serverfarm-tor2-1","slug":"serverfarm-tor2-1","name":"Serverfarm · TOR2.1","kind":"facility"},{"id":"rbc-guelph-computing-centre","slug":"rbc-guelph-computing-centre","name":"RBC · Guelph Computing Centre","kind":"facility"},{"id":"digital-realty-markham-data-centre","slug":"digital-realty-markham-data-centre","name":"Digital Realty · Toronto Star conversion","kind":"facility"},{"id":"maz-mesa-data-center","slug":"maz-mesa-data-center","name":"MAZ · Mesa data center","kind":"facility"},{"id":"equinix-sp3","slug":"equinix-sp3","name":"Equinix · SP3","kind":"facility"},{"id":"itau-mogi-mirim-data-center","slug":"itau-mogi-mirim-data-center","name":"Itaú · Mogi Mirim campus","kind":"facility"},{"id":"facility-fra17","slug":"facility-fra17","name":"FRA17 · Digital Park Fechenheim","kind":"facility"},{"id":"facility-paris-digital-park","slug":"facility-paris-digital-park","name":"Paris Digital Park · PAR8–PAR11","kind":"facility"},{"id":"facility-ld10-mercury-project","slug":"facility-ld10-mercury-project","name":"LD10 · London project","kind":"facility"},{"id":"facility-mentor-graphics-clare","slug":"facility-mentor-graphics-clare","name":"Mentor Graphics · County Clare","kind":"facility"},{"id":"facility-osl-hamar","slug":"facility-osl-hamar","name":"OSL-Hamar","kind":"facility"},{"id":"facility-svg-rennesoy","slug":"facility-svg-rennesoy","name":"SVG-Rennesøy","kind":"facility"},{"id":"facility-firstcolo-fra7","slug":"facility-firstcolo-fra7","name":"FRA7 · Rosbach","kind":"facility"},{"id":"facility-northc-groningen","slug":"facility-northc-groningen","name":"NorthC Groningen campus","kind":"facility"},{"id":"facility-colt-amsterdam","slug":"facility-colt-amsterdam","name":"Colt Amsterdam · historical case","kind":"facility"},{"id":"facility-colt-roosendaal","slug":"facility-colt-roosendaal","name":"Colt Roosendaal · historical case","kind":"facility"},{"id":"nextdc-s3-sydney","slug":"nextdc-s3-sydney","name":"NEXTDC S3 Sydney","kind":"facility"},{"id":"nextdc-s6-sydney","slug":"nextdc-s6-sydney","name":"NEXTDC S6 Sydney","kind":"facility"},{"id":"elmina-business-park-1a","slug":"elmina-business-park-1a","name":"Elmina Business Park 1A data center","kind":"facility"},{"id":"equinix-sg5","slug":"equinix-sg5","name":"Equinix SG5","kind":"facility"},{"id":"yotta-nm1","slug":"yotta-nm1","name":"Yotta NM1","kind":"facility"},{"id":"khazna-auh6","slug":"khazna-auh6","name":"Khazna AUH6","kind":"facility"},{"id":"khazna-dxb2","slug":"khazna-dxb2","name":"Khazna DXB2 / D3","kind":"facility"},{"id":"gastat-riyadh-data-center","slug":"gastat-riyadh-data-center","name":"GASTAT Riyadh data center","kind":"facility"},{"id":"rotem-bank-hapoalim","slug":"rotem-bank-hapoalim","name":"Rotem / Bank Hapoalim data center","kind":"facility"},{"id":"airtrunk","slug":"airtrunk","name":"AirTrunk","kind":"data_center_operator"},{"id":"qts","slug":"qts","name":"QTS Data Centers","kind":"data_center_operator"},{"id":"vantage-data-centers","slug":"vantage-data-centers","name":"Vantage Data Centers","kind":"data_center_operator"},{"id":"crusoe","slug":"crusoe","name":"Crusoe","kind":"data_center_operator"},{"id":"abilene-lancium-campus","slug":"abilene-lancium-campus","name":"Abilene / Lancium campus","kind":"facility"},{"id":"coreweave","slug":"coreweave","name":"CoreWeave","kind":"cloud_operator"},{"id":"sttgdc","slug":"sttgdc","name":"STTGDC","kind":"data_center_operator"},{"id":"oracle","slug":"oracle","name":"Oracle","kind":"cloud_operator"}],"gaps":[],"snapshotDate":"2026-09-28"}