{"entity":{"id":"colovore-santa-clara","slug":"colovore-santa-clara","name":"Colovore · Santa Clara engineering case","kind":"facility","summary":"Santa Clara colocation facility with Therma engineering and design documented.","description":"Legence describes Therma’s engineering and design for a 24,000-square-foot liquid-cooled facility. A 2014 report quotes its mechanical engineer on the cooling approach. Legence’s 2021 completion label conflicts with contemporary 2014 coverage, so this record does not assign a completion year or equate the case with a specific current Colovore site code.","countryCodes":["US"],"region":"North America","theme":"infrastructure","sourceIds":["therma-src-colovore","therma-src-colovore-2014"],"origin":"global","reviewedAt":"2026-10-01"},"connections":[{"id":"therma-colovore-operator","sourceId":"colovore","targetId":"colovore-santa-clara","label":"Named colocation customer","kind":"facility_client","description":"Legence identifies Colovore as the Santa Clara data-center customer in the historical engineering case.","sourceIds":["therma-src-colovore"],"recordIds":[],"status":"documented","date":null,"theme":"infrastructure"},{"id":"therma-colovore-engineering","sourceId":"therma","targetId":"colovore-santa-clara","label":"Mechanical engineering and design","kind":"mechanical_engineering","description":"Legence attributes engineering and design to Therma; 2014 reporting quotes a Therma mechanical engineer on the cooling system. No current maintenance contract is inferred.","sourceIds":["therma-src-colovore","therma-src-colovore-2014"],"recordIds":[],"status":"documented","date":null,"theme":"infrastructure"},{"id":"therma-location-colovore-santa-clara","sourceId":"colovore-santa-clara","targetId":"country-us","label":"Physical project location","kind":"located_in","description":"Santa Clara or San Jose, California; location alone does not establish a military use, tenant, or political affiliation.","sourceIds":["therma-src-colovore"],"recordIds":[],"status":"documented","date":null,"theme":"infrastructure"},{"id":"proposal-facility-levy-colovore-santa-clara","sourceId":"colovore-santa-clara","targetId":"covered-ai-data-center-sector","label":"Proposed data-center levy scope","description":"This named data-center facility falls within the sector addressed by the independent regeneration proposal. The liable legal entity, assessment basis and collection jurisdiction remain policy questions; this is not an enacted obligation or a payment.","kind":"proposed_levy_coverage","status":"proposal","sourceIds":[],"recordIds":[],"date":null,"theme":"regeneration"}],"finance":[],"sources":[{"id":"therma-src-services","title":"Therma data center services","url":"https://www.therma.com/data-center/","publisher":"Therma","publishedAt":null,"accessedAt":"2026-10-01","kind":"primary_company_record","note":"Lists mechanical design/build, automation, DCIM, preventive maintenance and repairs as capabilities; does not identify a current contract at a particular facility."},{"id":"therma-src-colovore","title":"Colovore Data Center case study","url":"https://www.wearelegence.com/case-studies/colovore-data-center","publisher":"Legence","publishedAt":null,"accessedAt":"2026-10-01","kind":"primary_project_record","note":"Attributes engineering and design of a Santa Clara Colovore facility to Therma. The page says completed 2021, while contemporary 2014 coverage already describes Therma project work; the date conflict is not resolved here. Performance and emissions figures are self-reported and excluded."},{"id":"therma-src-colovore-2014","title":"Colovore Brings Liquid-Cooled Colo to Silicon Valley","url":"https://www.datacenterknowledge.com/colocation/colovore-brings-liquid-cooled-colo-to-silicon-valley","publisher":"Data Center Knowledge","publishedAt":"2014-06-11","accessedAt":"2026-10-01","kind":"contemporary_reporting","note":"Quotes a Therma mechanical engineer about the Santa Clara cooling system; corroborates a historical project role, not ongoing maintenance."},{"id":"therma-src-space-park","title":"Digital Realty 1100 Space Park Data Center, 3rd Floor","url":"https://www.dpr.com/projects/data-center-for-leading-global-content-provider","publisher":"DPR Construction","publishedAt":null,"accessedAt":"2026-10-01","kind":"primary_project_record","note":"Names Digital Realty as client, DPR as accountable design/build lead and Therma Corp. as a design-team partner. Does not state Therma was the general contractor or a current service provider."},{"id":"therma-src-fortune","title":"Fortune Data Centers Commences Operations of New Green Data Center","url":"https://www.dpr.com/media/press-releases/fortune-data-centers-commences-operations-in-silicon-valley","publisher":"DPR Construction / Fortune Data Centers","publishedAt":"2009-04-28","accessedAt":"2026-10-01","kind":"primary_project_announcement","note":"Identifies the Fortune San Jose first phase and names Therma among project partners. It does not allocate Therma a specific trade or an ongoing maintenance contract."}],"neighbors":[{"id":"covered-ai-data-center-sector","slug":"covered-ai-data-center-sector","name":"AI companies & data-center operators","kind":"policy"},{"id":"country-us","slug":"country-us","name":"United States","kind":"country"},{"id":"therma","slug":"therma","name":"Therma","kind":"contractor"},{"id":"colovore","slug":"colovore","name":"Colovore","kind":"data_center_operator"},{"id":"colovore-santa-clara","slug":"colovore-santa-clara","name":"Colovore · Santa Clara engineering case","kind":"facility"}],"gaps":[{"id":"therma-gap-colovore-identity","title":"Resolve the Colovore case date and current site identity","description":"Legence labels the case completed in 2021, while a 2014 report documents Therma’s participation. The selected sources do not reconcile those dates or identify which current Colovore site code covers the case.","entityIds":["therma","colovore-santa-clara","colovore"],"sourceIds":["therma-src-colovore","therma-src-colovore-2014"],"nextStep":"Obtain the original project record and facility address before assigning a completion year or current site code."},{"id":"therma-gap-ongoing-service","title":"No named-site Therma maintenance contract verified","description":"Therma markets maintenance, building automation and DCIM services, but the selected Santa Clara project records establish historical design or participation only. The general customer list does not give a facility, date or service term.","entityIds":["therma","colovore-santa-clara","digital-realty-1100-space-park","fortune-san-jose-phase-one"],"sourceIds":["therma-src-services","therma-src-colovore","therma-src-space-park","therma-src-fortune"],"nextStep":"Seek facility-specific current service contracts or operator statements with dates and exact scope before adding maintenance or DCIM edges."}],"snapshotDate":"2026-10-01"}